1976年大石河尾矿坝地震反应分析

    Seismic  Response  Analysis  of  the  1976  Dashihe  Tailings  Dam

    • 摘要: 位于我国东北、华北地区的十几座大型尾矿坝成功地经受了1975年海城地震(M=7.3)和1976年唐山地震(M=78,M=71)的袭击,这为研究上游法尾矿坝的抗震性能以及评价目前坝体地震反应分析、稳定分析方法的能力及其有效性提供了宝贵的经验与资料。本文采用二维真非线性有效应力动力反应分析程序TARA-3,研究了位于唐山市东北约50km处具有代表性的大石河尾矿坝。计算结果与震后宏观调查结果相符,基本上再现了1976年大石河尾矿坝在唐山地震过程中的表现,从而也进一步验证了TARA-3计算程序的有效性

       

      Abstract: More  than  ten  large  tailings  dams  located  in  Northeast  and  North  China  successfully  survived  the  1975  Haicheng  Earthquake  (M=7  3)  and  the  1976  Tangshan  Earthquake  (M=7  8  &  M=7  1)      Seismic  performances  of  these  tailings  dams  provide  the  valued  data  to  understand  the  seismic  stability  of  the  upstream  tailings  dam  and  demonstrate  the  capability  and  utility  of  the  analysis  methods  developed  for  the  seismic  response  and  stability  of  the  tailings  dam      Dashihe  tailings  dam,  a  typical  upstream  dam  and  about  50km  northeast  of  Tangshan  City,  was  studied  using  program  TARA-3:2-D  direct  nonlinear  dynamic  effective  stress  analysis      Analytical  results  are  fairly  consistent  with  the  seismic  damage  after  the  1976  Earthquake      The  results  confirm  the  validation  of  the  analysis  method  developed  by  Finn  and  the  capacity  of  program  TARA-3  once  more

       

    /

    返回文章
    返回