| Citation: | YANG Zhi-yong, JIANG Yu-sheng, ZHANG Jin-xun. Radial opening ratio of EPB TBM cutterheads[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(12): 2312-2317. DOI: 10.11779/CJGE201812020 |
| [1] |
BURGER W. design pinciples for soft ground cutterheads[C]// Proceedings, Rapid Excavation and Tunneling Conference. 2007: 784-792.
|
| [2] |
李向红, 傅德明. 土压平衡模型盾构掘进试验研究[J]. 岩土工程学报, 2006, 28(9): 1101-1105.
(LI Xiang-hong. FU Deming.Experimental study on excavation behaviour using model epb shield with a diameter of 1.8 m[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(9): 1101-1105. (in Chinese)) |
| [3] |
王洪新. 土压平衡盾构刀盘开口率选型及其对地层适应性研究[J]. 土木工程学报, 2010(3): 88-92.
(WANG Hong-xin.Type selection of the head aperture ratio of EPB shield cutterheads and adaptability to stratum characteristics[J]. China Civil Engineering Journal, 2010(3): 88-92. (in Chinese)) |
| [4] |
ZHAO J, GONG Q M, EISENSTEN Z.Tunnelling through a frequently changing and mixed ground: a case history in Singapore[J]. Tunnelling and Underground Space Technology, 2007, 22(4): 388-400.
|
| [5] |
MAID U.Design features of the botlek rail tunnel in the betuweroute[J]. Tunnelling and Underground Space Technology, 1999, 14(2): 135-140.
|
| [6] |
ATES U, BILGIN N, COPUR H.Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects[J]. Tunnelling and Underground Space Technology, 2014, 40(Supplement C): 46-63.
|
| [7] |
CARRIERI G, FORNARI E, GUGLIELMETTI V, et al.Torino metro line 1: use of three tbm-epbs in very coarse grained soil conditions[J]. Tunnelling and Underground Space Technology, 2006, 21(3): 274-275.
|
| [8] |
江华, 张晋勋, 苏艺, 等. 砂卵石地层土压平衡盾构隧道施工土体改良试验研究[J]. 中国铁道科学, 2013, 34(4): 40-45.
(JIANG Hua, ZHANG Jin-xun, SU Yi, et al.Study on soil conditioning experiments during earth pressure balance shield tunneling in sand gravel strata[J]. China Railway Science, 2013, 34(4): 40-45. (in Chinese)) |
| [9] |
XU Q, ZHU H, DING W.Laboratory model tests and field investigations of epb shield machine tunnelling in soft ground in Shanghai[J]. Tunnelling and Underground Space Technology, 2011, 26(1): 1-14.
|
| [10] |
刘建琴, 郭伟, 黄丙庆, 等. 土压平衡盾构刀盘开口率与刀盘前后压差的关系[J]. 天津大学学报, 2011, 44(8): 659-664.
(LIU Jian-qin, GUO Wei, HUANG Bing-qing, et al.Relationship between aperture ratio and fore-and-back pressure of EPB shield cutter head[J]. Journal of Tianjin University, 2011, 44(8): 659-664. (in Chinese)) |
| [11] |
王洪新. 土压平衡盾构刀盘开口率对土舱压力的影响[J]. 地下空间与工程学报, 2012, 8(1): 89-93, 104.(WANG Hong-xin. Influence of aperture ratio of cutterhead of EPB shield on earth pressure in the chamber[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(1): 89-93, 104. (in Chinese))
|
| [12] |
王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J]. 土木工程学报, 2009(7): 113-118.
(WANG Hong-xin.Effect of cutterhead compressing the front soil and influence of head aperture ratio on contact pressure of EPB shield to the front soil[J]. China Civil Engineering Journal, 2009(7): 113-118. (in Chinese)) |
| [1] | ZHANG Jinxun, LI Bo, JIANG Yusheng, ZHOU Liugang, YIN Minglun, SUN Zhengyang, JIANG Hua. Design method for uniform wear of shield cutterhead and cutters in sand–pebble strata[J]. Chinese Journal of Geotechnical Engineering, 2025, 47(7): 1474-1483. DOI: 10.11779/CJGE20240165 |
| [2] | CHEN Xingxin, HE Minggao, SHI Wencheng, GUO Liqun. Calculation of pressures on after incomplete arch cutterhead removal in earth-rock composite formation by in-situ junction method for shield tunneling[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(12): 2652-2660. DOI: 10.11779/CJGE20231228 |
| [3] | DUAN Limin, WANG Jian, HOU Liping, LU Yang, MIN Fanlu, MAO Ziming. Research and application of balance mechanism of excavation surface of slurry shield tunnels considering cutterhead thrust[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(7): 1556-1562. DOI: 10.11779/CJGE20230324 |
| [4] | ZHANG Kui, ZHANG Yu-lin, ZHENG Xue-jun, ZHOU You-hang, QIAO Shuo. Establishment and experimental verification of rock penetration load model for TBM disc cutters based on cavity expansion theory[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(12): 2263-2271. DOI: 10.11779/CJGE202212013 |
| [5] | SHE Lei, ZHANG She-rong, HE Sun-wen, WANG Chao, LI Lei, JING Yong, LIU Yong. Prediction model for TBM disc cutter wear based on dense core theory[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(5): 970-978. DOI: 10.11779/CJGE202205021 |
| [6] | ZHOU Xin-chao, MA Xiao-jing, LIAO Xiang-yun, QI Si-wei, LI Hong-yu. Numerical simulation of abrasive water jet impacting porous rock based on SPH method[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(4): 731-739. DOI: 10.11779/CJGE202204016 |
| [7] | FANG Yong, WANG Kai, TAO Li-ming, LIU Peng-cheng, DENG Ru-yong. Experimental study on clogging of cutterhead for panel earth-pressure-balance shield tunneling in cohesive strata[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(9): 1651-1658. DOI: 10.11779/CJGE202009009 |
| [8] | XU You-jun, WEN Zhong-kun, YAN Lü-shun, BAI Xue-guang, LIU Xin-mei. Experimental study on soil improvement during construction of EPB rectangular pipe jacking with multi-cutter[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(2): 288-296. DOI: 10.11779/CJGE201602012 |
| [9] | GONG Qiu-ming, HE Guan-wen, ZHAO Xiao-bao, MA Hong-su, LI Xiao-zhao, ZHANG Hao, MIAO Chong-tong. Influence of different cutter spacings on rock fragmentation efficiency of Beishan granite by TBM[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(1): 54-60. DOI: 10.11779/CJGE201501005 |
| [10] | Cutting torque during tunnelling process of earth pressure balance shield machine in homogeneous ground[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(1). |