Citation: | CHENG Jie-lin, LI Yu-zhong, LIU Xiu-zhen, WEN Guo-xuan. Application of many concentric ring supports with large diameter in super deep foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 122-126. DOI: 10.11779/CJGE2014S1021 |
[1] |
徐杨青, 程杰林. 双圆环内支撑结构在深厚软土深基坑工程中的应用[J]. 土工基础, 2007, 21(5): 1-3, 13. (XU Yang-qing, CHENG Jie-lin. Application of double-circular beam bracing system for deep excavation in soft soil[J]. Soil Engineering and Foundation, 2007, 21(5): 1-3, 13. (in Chinese))
|
[1] | YING Hongwei, XIONG Yifan, LI Binghe, LÜ Wei, CHENG Kang, ZHANG Jinhong. Time-dependent solution for ground settlement induced by excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(10): 2041-2050. DOI: 10.11779/CJGE20230727 |
[2] | WANG Shi-min, CHEN Bing, WANG Xian-ming, LU Xi-xi, RUAN Lei, JIAN Yun-qi. Model tests on reasonable construction time of secondary lining of shield tunnel[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(5): 882-891. DOI: 10.11779/CJGE202005010 |
[3] | WANG Wei, XU Kai, WANG Hai-long, LI Lu-lu. Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(s1): 85-90. DOI: 10.11779/CJGE2017S1017 |
[4] | ZHANG Jian-hai, WANG Ren-kun, ZHOU Zhong, ZHENG Lu, ZHANG Ru, WANG Lu, XIE He-ping. Optimum support time of brittle underground cavern based on time-dependent deformation[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(10): 1908-1914. DOI: 10.11779/CJGE201710020 |
[5] | WANG Zhe-chao, LU Bao-qi, LI Shu-cai, QIU Dao-hong, QIAO Li-ping, YU Feng, BI Li-ping. Risk assessment for an underground crude oil storage facility with water-curtaining system during construction phase[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(6): 1057-1067. DOI: 10.11779/CJGE201506012 |
[6] | WANG Hua-ning, ZENG Guang-shang, JIANG Ming-jing. Analytical solutions of deeply buried tunnel during construction considering time-dependent behaviors of rock——simulations and solutions of sequential excavation, rockbolt reinforcement and liner installation[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(7): 1334-1343. DOI: 10.11779/CJGE201407018 |
[7] | HAN Shang-yu, LI Hong, HONG Bao-ning. Risk analysis method for project duration of highways during construction period and its application[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 264-268. |
[8] | ZHUO Zhi-fei, FU Weng-guang, ZHOU Huan-jie, FENG Shen-duo, ZHOU Kai. Design example of deep excavation of a high-rise building[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 687-691. |
[9] | DU Jinlong, YANG Min. Time effect analysis of influence of excavation on adjacent pile foundations[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(7): 1038-1043. |
[10] | JIA Jianqing, WANG Hongtu, LI Xiaohong, NIU Huimin, HU Guozhong. Time-reliability of tunnel support under complex conditions[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(3): 390-393. |