HAN Shang-yu, LI Hong, HONG Bao-ning. Risk analysis method for project duration of highways during construction period and its application[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 264-268.
Citation: HAN Shang-yu, LI Hong, HONG Bao-ning. Risk analysis method for project duration of highways during construction period and its application[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 264-268.

Risk analysis method for project duration of highways during construction period and its application

More Information
  • Received Date: February 27, 2013
  • Published Date: July 18, 2013
  • In order to enhance the analysis accuracy of projects duration of highways during construction period, a new method for is established road duration risk based on the risk analysis theory. Firstly, the following concepts are defined: allowable stage duration, expected according to the characteristic of road construction stage duration, risk rate of stage duration, weight of stage duration and stage time risk. Secondly, the proposed method for project duration risk of highways associated with is discussed the simple construction flow chart. Finally, taking the risk evaluation of the embankment construction process of the first ring road in Foshan as an example, the calculation process of the method is demonstrated, and its practicality is rerified.
  • MCKIM R,HEGAZY T,ATTALLA M. Project performance control in construction projects[J]. Journal of Construction Engineering and Management, 2000, 126(2): 137-141.
    KHANG Do Ba,MYINT Yin Mon. Time, cost and quality trade2off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
    BAHU A J G,SURESH N. Project management with time , cost and quality considerations[J]. European Journal of Operational Research, 1996, 88(2): 320-327.
    王新征,曹邦卿. 考虑工期成本时确定最优报价的方法[J].(南阳师范学院学报), 2007, 6(9): 75-77.(WANG Xin-zheng,CAO Bang-qing. Method to determine optimum contract bid on consideration of time cost[J]. Journal of Nanyang Normal University, 2007, 6(9): 75-77. (in Chinese))
    徐玖平,胡知能. 运筹学-数据、模型、决策[M]. 北京: 科学技术出版社, 2006: 115-126. (XU Jiu-ping,HU Zhi-neng. Operations research-data, models, decision- making[M]. Beijing: Science Press, 2006: 115-126(in Chinese))
    王 键,刘尔烈,骆 刚. 工程项目管理中工期2成本2质量综合均衡优化[J]. (系统工程学报), 2004, 19(2): 48-153.(WANG Jian,LIU Er-lie,LUO Gang. Analysis of time cost quality tradeoff optimization in construction projecr management[J]. Journal of Systems Engineering, 2004, 19(2): 48-153. (in Chinese))
    赵 勇,黄定轩,谭建鑫. 基于事例和置信度的多因素重要性排序方法[J]. (西南交通大学学报), 2003, 38(1): 102-105.(ZHAO Yong,HUANG Ding-xuan,TAN Jian-xin. Case-and confidence-level-based significance ordering of multiple factors[J]. Journal of Southwest Jiaotong University, 2003, 38(1): 102-105. (in Chinese))
    樊治平,张 全,马 建. 多属性决策中权重确定的一种集成方法[J]. (管理科学学报), 1998, 1(3): 50-53.(FAN Zhi-ping,ZHANG Quan,MA Jian. An integrated approach to determ-ining weights in multiple attribute decision making[J]. Journal of Management Sciences in China, 1998, 1(3): 50-53. (in Chinese))
    吴之明. 网络计划中的时间价值与风险[J]. (系统工程理论与实践), 1994(5): 1-5.(WU Zhi-ming. The value and risk of time in the network schedule[J]. Systems Engineering —Theory & Practice, 1994(5): 1-5. (in Chinese))
    王卓甫. 工程项目风险管理-理论、方法与应用[M].北京:中国水利水电出版社, 2003.(WANG Zhuo-fu. Engineering project risk management-theory, methods and applications[M].Beijing:China Water Power Press, 2003. (in Chinese))
    HE J R. Estimating the distributions of manufactured dimensions with the beta probability density function[J]. Mach Tools Manu Fact, 1991, 31: 383-396.
    肖 丹,杨兴国,肖陪伟. MC方法在施工进度风险分析中的应用[J]. (四川水利), 2006(1): 44-47.(XIAO Dan,YANG Xing-guo,XIAO Pei-wei. Application of Monte Carlo simulation on project schedule risk analysis[J]. Sichuan Water Conser Vancy, 2006(1): 44-47. (in Chinese))
    秦 爽. 工程工期风险熵理论研究[D]. 西安: 西安建筑科技大学, 2007(5): 40-44.(QIN Shuang,A study on engineering period risk of entropy theory[D]. Xi'an: Xian University of Architecture and Technology A study on engineering period risk of entropy theory[D]. Xi'an: Xian University of Architecture and Technology, 2007(5): 40-44. (in Chinese))
  • Related Articles

    [1]SUN Guang-chao, KONG Gang-qiang, LI Jian-lin, LUO Ya. Model tests on dynamic response of XCC pile-raft composite foundation under different embankment heights[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S2): 45-50. DOI: 10.11779/CJGE2021S2011
    [2]WANG Lan-min, PU Xiao-wu, WU Zhi-jian, XU Shun-hua, LIU Kun. Shaking table tests on dynamic response of loess slopes under coupling effects of earthquakes and rainfalls[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(7): 1287-1293. DOI: 10.11779/CJGE201807015
    [3]FENG Xing, YAO Yang-ping, Li Ru-ning, WAN Zheng. Application of UH model considering temperature to finite element method[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(zk2): 181-185. DOI: 10.11779/CJGE2015S2035
    [4]CHENG Ye, WANG Ji-qian, XIA Pei-yun. Experimental study on dynamic response of single pile under impact action[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 1041-1044.
    [5]TANG Liang, LING Xian-zhang, SU Lei, LIU Chun-hui, ZHANG Xiao-yu, LI Qing-hua. Numerical simulation of dynamic response for pile groups of bridges in liquefiable soils[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 401-407.
    [6]LIU Xi-kang, ZHANG Jian-hai, ZHAO Wen-guang. Stability analysis method for arbitrary slip block based on dynamic finite element method[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 363-368.
    [7]XU Mingbiao, PENG Dehong. Finite element analysis of dynamic response on blasting vibration in slope excavation of a hydroelectric power station[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(6): 770-775.
    [8]HUANG Yu, YASHIMA Atsushi, ZHANG Feng. Finite element analysis of pile-soil-structure dynamic interaction in liquefiable site[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 646-651.
    [9]HUANG Maosong, QIAN Jiangu, WU Shiming. An adaptive finite element method for strain localization and progressive failure of earth dam under earthquake[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(3): 306-310.
    [10]ZHAO Chenggang, WANG Jinting, SHI Peixin, LI Weihua. Dynamic analysis of fluid-saturated porous media by using explicit finite element method[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(2): 178-182.

Catalog