LIU Mingzhen, HAN Jiangang. Analysis on the quality problem of the piled-raft of a tall building[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 313-316.
    Citation: LIU Mingzhen, HAN Jiangang. Analysis on the quality problem of the piled-raft of a tall building[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 313-316.

    Analysis on the quality problem of the piled-raft of a tall building

    • Based on the data now available, the reasons why the quality problem of the piled raft foundation happened are analysed. From them some experiences and lessons can be drawn. Some new views on several geotechnical engineering problems were put forward.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return