Coupling method of two-dimensional discontinuum-continuum based on contact between particle and element[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(10).
Citation: Coupling method of two-dimensional discontinuum-continuum based on contact between particle and element[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(10).

Coupling method of two-dimensional discontinuum-continuum based on contact between particle and element

More Information
  • Received Date: May 25, 2009
  • Revised Date: January 19, 2010
  • Published Date: October 14, 2010
  • A coupling method of two-dimensional discontinuum-continuum is proposed based on the combination of the discrete element method (DEM) and the finite difference method (FDM). The DEM is used in the focus zone, and the finite difference method is used in the surrounding zone. The contact between the finite elements and the particle at the boundary edges follows the principles defined in the DEM. In the continuum element, the velocities at the contact point are related to the nodal velocities by interpolation, and the contact forces are contributed to the nodal forces with weight value. The FLAC and PFC are introduced to approach the coupling method by the socket connection. An example is presented to demonstrate the validity of the present method.
  • Related Articles

    [1]ZHAO Mi, HUANG Yi-ming, WANG Pi-guang, XU Hai-bin, DU Xiu-li. Analytical solution for water-pile-soil interaction under horizontal dynamic loads on pile head[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(5): 907-915. DOI: 10.11779/CJGE202205014
    [2]ZHOU Yong, ZHU Ya-wei. Pile-soil interaction considering thickness of contact surface[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(S1): 247-251. DOI: 10.11779/CJGE2018S1040
    [3]ZHANG Ai-jun, MO Hai-hong, ZHU Zhen-de, ZHANG Kun-yong. Analytical solution to interaction between passive piles and soils[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 120-127.
    [4]ZHOU Jian, BAI Yanfeng, ZHANG Zhao, JIA Mincai. Lab model tests and PFC2D modeling of pile groups in sands[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(8): 1275-1280.
    [5]WANG Tao, LIU Jinli. Tests on influence of pile-soil-pile interaction[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(1): 100-105.
    [6]WANG Chenglei, WANG Jianhua, FENG Shilun. Analysis on p-y curves of soil-pile interaction in liquefied soils[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(10): 1500-1505.
    [7]ZHOU Jian, ZHANG Gang, ZENG Qingyou. Model tests and PFC2D numerical analysis of active laterally loaded piles[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(5): 650-656.
    [8]CAI Jing, ZHANG Xianmin, WANG Jiahua. Experimental study on pile-soil interaction parameter in pile integrity test[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(5): 617-621.
    [9]WANG Jianhua, FENG Shilun. The shake table test on soil-pile interaction[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(5): 616-618.
    [10]ZHENG Gang, GAO Xifeng, REN Yanhua, WU Yonghong. A study on the interaction of cap(foundation),pile and soil[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(3): 307-312.

Catalog