• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
QIU Ren-dong, LIU Jin-li, QIU Ming-bing, ZHENG Wen-hua, YIN Rui, GUO Jin-xue. Comprehensive treatment of loading and unloading of pile foundation with variable stiffnesses for a high-rise building accident[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 1081-1086.
Citation: QIU Ren-dong, LIU Jin-li, QIU Ming-bing, ZHENG Wen-hua, YIN Rui, GUO Jin-xue. Comprehensive treatment of loading and unloading of pile foundation with variable stiffnesses for a high-rise building accident[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 1081-1086.

Comprehensive treatment of loading and unloading of pile foundation with variable stiffnesses for a high-rise building accident

More Information
  • Received Date: June 04, 2013
  • Published Date: November 24, 2013
  • According to the correct analysis of the reasons for differential settlement of a high-rise building, the integrated reinforcement technologies and measures of the building are established especially. In order to stop the high settlement and inclination ratio and ensure that the deformation of the building meets the standard requirement, the project takes four measures: (1) to unload and reduce settlement at the one side, and to upload and increase settlement at the other side; (2) to take variable stiffness reinforcement by using concrete-filled steel pipe with post-grouting technology; (3) to add the foundation pressure of small-settlement side with post-cast strip cutting method so as to make the settlement be larger; (4) to arrange a scientific and reasonable sequence of construction to realize the expected results. Finally, the settlement ratio of the building decreases from 0.8 mm/d to 0.006 mm/d; the stable tilt value also decreases from 2.8‰ to 2.28‰, which both satisfy the requirements of the national standard. Problems happened during the process of building implementation of the project are also discussed. The research results and strengthening experience may provide reference for similar projects.
  • [1]
    GB 50007—2011 建筑地基基础设计规范[S]. 北京: 中国建筑工业出版社, 2011. (GB 50007—2011 Code for design of building foundation[S]. Beijing: China Architecture and Building Press, 2011. (in Chinese))
    [2]
    JGJ 94—2008建筑桩基技术规范 [S]. 北京: 中国建筑工业出版社, 2008. (JGJ 94—2008 Technical code for building pile foundation[S]. Beijing: China Architecture and Building Press, 2008. (in Chinese))
    [3]
    JGJ 125—99 危险房屋鉴定标准[S]. 北京: 中国建筑工业出版社, 2004. (JGJ 125—99 Standard of dangerous building appraisal[S]. Beijing: China Architecture and Building Press, 2004. (in Chinese))
    [4]
    JGJ 8—2007建筑变形测量规范[S]. 北京: 中国建筑工业出版社, 2007. (JGJ 8—2007 Code for deformation measuement of building and structure[S]. Beijing: China Architecture and Building Press, 2007. (in Chinese))
  • Related Articles

    [1]ZHOU Ya-long, WANG Xu, ZHANG Yan-jie, ZHANG Xiao-hua, GAO Yong-guang, YE Ying-gao. Composite post grouting at pile tip and bearing characteristics of cast-in-place pile foundation[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(10): 1864-1872. DOI: 10.11779/CJGE202210012
    [2]LIU Zheng-hong, ZHENG Jian-guo, ZHANG Ji-wen, QI Chang-jun. Method for post-construction settlement of pile foundation of bridges in collapsible loess area[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(2): 320-326. DOI: 10.11779/CJGE201402008
    [3]LIU Kai-fu, FANG Peng-fei, LIU Xue-mei, HU Yi, XIE Xin-yu. Experimental study on vertical bearing performance of base post-grouted cast-in-place plies in soft soils[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 1054-1057.
    [4]ZHANG Yu-ting, KOU Xiao-qiang, ZUO Dian-jun, QIAO Xiao-li. Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 753-757.
    [5]ZHANG Jun-hui, HUANG Xiang-ning, ZHENG Jian-long, WEI Jian-ming, XU Xian-jin. Centrifugal model tests on post-construction settlement of high embankment of Hechi Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(4): 773-778.
    [6]Zhu Cai-hui, LI Ning, LIU Ming-zhen, WEI Yi-feng. Spatiotemporal laws of post-construction settlement of loess-filled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(2): 293-301.
    [7]ZHANG Zhong-miao, HE Jing-yu, FANG Kai. Experimental study on size effect of large-diameter bored cast-in-situ piles with post-grouting in soft soil[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 32-37.
    [8]CHEN Yong-hui, SHI Gang-chuan, CAO De-hong, YING Hai-jian, WANG Xin-quan. Control of post-construction settlement by replacing subgrade with foamed cement banking[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(12): 1854-1862.
    [9]Field tests on post-construction settlement of DJMP composite foundation[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3).
    [10]LU Mengmeng, XIE Kanghe, ZHANG Yuguo, CHEN Guohong. Theoretical solution for consolidation of composite foundations considering construction disturbance and loading effect[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(4): 549-554.

Catalog

    Article views (254) PDF downloads (296) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return