• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
Field tests on post-construction settlement of DJMP composite foundation[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3).
Citation: Field tests on post-construction settlement of DJMP composite foundation[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3).

Field tests on post-construction settlement of DJMP composite foundation

More Information
  • Received Date: December 08, 2008
  • Revised Date: May 12, 2009
  • Published Date: March 14, 2010
  • The effectiveness of soft soil improved by dry jet mixing pile (DJMP) composite foundation is fully studied through the field tests on high-speed railways. Under the geological conditions, 5-cm post-construction settlement of the soft soil improved by the DJMP composite foundation can be controlled in a short period. The compressibility of the soft soil treated by the DJMP is smaller than that by plastic drain belt both for crust and silt soil. The modulus of compressibility of silty soil improves greatly. The stress and differential settlement of the composite foundation can be adjusted by gravel mat. The pile doesn’t penetrate into embankment with gravel mat under embankment. Pore water pressure and settlement data measured in field tests indicate that the rate of consolidation is faster than that of natural soft soil. The ratio of stress between piles and soil changes with sites, time and load. The ratio of stress between piles and soil is about 5 under the stable load.
  • Related Articles

    [1]YANG Guang-hua, XU Chuan-bao, LI Zhi-yun, JIANG Yan, ZHANG Yu-cheng. Simplified method for settlement calculation of rigid pile composite foundation in soft soils[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 21-24. DOI: 10.11779/CJGE2017S2006
    [2]FENG Huai-ping, GENG Hui-ling, HAN Bo-wen, SHANG Wei-dong, CHANG Jian-mei. Prediction model for settlement of high-speed railway embankment in unsaturated areas[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(6): 1089-1095. DOI: 10.11779/CJGE201706015
    [3]LIU Zheng-hong, ZHENG Jian-guo, ZHANG Ji-wen, QI Chang-jun. Method for post-construction settlement of pile foundation of bridges in collapsible loess area[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(2): 320-326. DOI: 10.11779/CJGE201402008
    [4]ZHANG Yu-ting, KOU Xiao-qiang, ZUO Dian-jun, QIAO Xiao-li. Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 753-757.
    [5]Zhu Cai-hui, LI Ning, LIU Ming-zhen, WEI Yi-feng. Spatiotemporal laws of post-construction settlement of loess-filled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(2): 293-301.
    [6]XUE Xiang, SONG Lian-liang, JIA Liang, LE Yuan, GE Hong. New prediction method for post-construction settlement of soft-soil roadbed of expressway[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 125-130.
    [7]DING Guiling, WANG Lianjun, LIU Shengchuan. Effect of cushion thickness on deformation characteristics of CFG pile composite foundation with caps under flexible load[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(7): 997-1001.
    [8]XU Chao, YE Guanbao, JIANG Zhusheng, ZHOU Qizhao. Research on mechanism of combined improvement of soft soils based on field monitoring[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(7): 918-921.
    [9]ZHANG Gongxin, MO Haihong, ZENG Qingjun, LIU Jifu. Analysis of negative effect of geotextile on long-term stability and post-construction settlement of embankment[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 686-689.
    [10]ZHANG Huiming, XU Yusheng, ZENG Qiaoling. Deformation behavior of Shenzhen soft clay and post-construction settlement[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(4): 509-514.

Catalog

    Article views (940) PDF downloads (417) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return