Citation: | HU Lian-xing, ZHONG Deng-hua, TONG Da-wei. Simulation and real-time control of whole construction progress of long-distance diversion tunnels under unfavorable geological condition s[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(3): 497-503. |
[1] |
胡肇枢 , 王卓甫 . PERT 网络计算分析之补充 [J]. 河海大学学报 , 2002, 30 (1): 29 – 34. (HU Zhao-shu, WANG Zhuo-fu. Supplement to analysis of PERT network calculation[J]. Journal of Hohai University, 2002, 30 (1): 29 – 34. (in Chinese))
|
[2] |
王孝坤 , 石勇民 . 工程项目进度控制系统的研制开发 [J]. 东北公路 , 2003, 26 (2): 134 – 136. (WANG Xiao-kun, SHI Yong-min. Study on plan control system of project item[J]. Northeastern Highway, 2003, 26 (2): 134 – 136. (in Chinese))
|
[3] |
刘奎建 . 大型地下洞室群施工进度实时控制研究 [D]. 天津 : 天津大学 , 2007. (LIU Kui-jian. Real-time control for construction scheduling of large scale underground structure group[D]. Tianjin: Tianjin University, 2007. (in Chinese))
|
[4] |
吴世勇 , 王 鸽 . 锦屏二级水电站深埋长隧洞群的建设和工程中的挑战性问题 [J]. 岩石力学与工程学报 , 2010, 29 (11): 2161 – 2171. (WU Shi-yong, WANG Ge. Challenge issues in construction and project of large-scale deep-buried tunnel group of Jinping II[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (11): 2161 – 2171. (in Chinese))
|
[5] |
TOMMELEIN I D, CARR R I, ODEH A M. Knowledge based assembly of simulation networks using construction designs, plans, and methods[C]// Proc 1994 Winter Simulation Conf, IEEE, Piscataway, N J, 1999: 1145 – 1152.
|
[6] |
钟登华 , 刘奎建 . 基于实时仿真的地下洞室群施工进度预测与控制 [J]. 天津大学学报 , 2007, 40 (6): 721 – 725. ( ZHONG Deng-hua, LIU Kui-jian. Schedule forecasting and control based on real-time simulation of underground struc ture group construction[J]. Journal of Tianjin University, 2007, 40 (6): 721 – 725. (in Chinese))
|
[7] |
FALCO M D, MACCHIAROLI R. Timing of control activities in project planning[J]. International Journal of Project Management, 1998, 16 (1): 51 – 58.
|
[8] |
胡程顺 . 水电工程进度控制及其优化方法研究 [D]. 天津 : 天津大学 , 2005. (HU Cheng-shun. Optimization of construction schedule and control method in hydroelectric project[D]. Tianjin: Tianjin University, 2005. (in Chinese))
|
[9] |
李景茹 , 钟登华 , 刘东海 , 等 . 水利水电工程三维动态可视化仿真技术与应用 [J]. 系统仿真学报 , 2006, 18 (1): 116 – 119. (LI Jing-ru, ZHONG Deng-hua, LIU Dong-hai, et al. Methodology and application of three-dimensional dynamic visual simulation of hydraulic and hydroelectric engineering[J]. Journal of System Simulation, 2006, 18 (1): 116 – 119. (in Chinese))
|
[1] | SHAO Shuai, SHAO Sheng-jun, SHE Fang-tao, LI Jun-qi. Effect of ground fissures on lining structure of tunnels and engineering measures[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S1): 176-180. DOI: 10.11779/CJGE2021S1032 |
[2] | CHEN Yun, HU Zhi-gang, XU Han. Influence factors and control measures for the density of rockfill by using irrigation method[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(s1): 177-181. DOI: 10.11779/CJGE2017S1035 |
[3] | LIU Bo, NIU Yun-hua, WANG Ke, DAI De-fu. Characteristic analysis and control measures for debris flow in Baitan Gully of Wudongde Hydropower Station[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(zk1): 225-230. DOI: 10.11779/CJGE2016S1042 |
[4] | TANG Hui, LI Xiao-jun, ZHOU Guo-liang. Measure for eliminating drift instability of multi-transmission formula in solution of scattering problems[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(5): 952-958. DOI: 10.11779/CJGE201605023 |
[5] | MA Qin, ZHOU Ya-jun. Prevention measures for diffraction flows around H-type steel joint of diaphragm wall[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 233-235. DOI: 10.11779/CJGE2014S2039 |
[6] | XIN Chun-lei, GAO Bo, ZHOU Jia-mei, SHEN Yu-sheng, QUAN Xiao-juan. Shaking table tests on performances of anti-seismic and damping measures for fault-crossing tunnel structures[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(8): 1414-1422. DOI: 10.11779/CJGE201408006 |
[7] | LI Zong-li, PEI Xiang-hui, LÜ Cong-cong, ZHANG Guo-hui. Reasonable permeability coefficient and engineering measures of concrete lining circle[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(6): 1167-1172. DOI: 10.11779/CJGE201406024 |
[8] | HUANG Qiangbing, PENG Jianbing, FAN Hongwei, YANG Peimin, MEN Yuming. Metro tunnel hazards induced by active ground fissures in Xi’an and relevant control measures[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(5): 781-788. |
[9] | MA Lifeng, LIU Jiankun, LI Qingwu. Measures for roadbed problems of railways in permafrost regions of Northeast China[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(3): 475-479. |
[10] | ZOU Degao, KONG Xianjing, Ling H.I., ZHU Tong. Experimental study on the uplift behavior of pipeline in saturated sand foundation and earthquake resistant measures during an earthquake[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(3): 323-326. |