Citation: | WANG Hui, HUANG Hong-wei. Reliability evaluation method for segment joints of metro shield tunnels in soft soils[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 278-283. |
[1] |
胡志平 , 罗丽娟 . 管片衬砌结构可靠度分析的优化方法 [J]. 岩石力学与工程学报 . 2005, 24 (22): 4145 – 4150. (HU Zhi-ping , LUO Li-juan. Study on reliability optimization of segments lining in shield tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2005 , 24 (22): 4145 – 4150. (in Chinese))
|
[2] |
李 罡 . 软土公路运营盾构隧道纵向结构安全性态评估 [D]. 上海 : 同济大学 , 2009. (LI Gang. Safety behavior assessment of longitudinal structure of operated road shield tunnel[D]. Shanghai: Tongji University, 2010. (in Chinese))
|
[3] |
金伟良 , 贡金鑫 , 赵国藩 . 结构可靠度理论 [M]. 北京 : 中国建筑工业出版社 , 2000. (JIN Wei-liang, GONG Jin-xin, ZHAO Guo-fan. Theory of structure reliability[M]. Beijing: China Architecture and Building Press, 2000. (in Chinese))
|
[4] |
刘 宁 . 可靠度随机有限元法及其工程应用 [M]. 北京 : 中国水利水电出版社 , 2001. ( LIU Ning . The reliability stochastic finite element method and engineering applications[M]. Beijing: China Water Power Press, 2001. ( in Chinese ) )
|
[5] |
FARAVELLI. A response surface approach for reliability analysis[J]. Journal of Engineering Mechanics, 1989, 115 (12): 2763 – 2781.
|
[6] |
ANG AH-S, TANG W H. Probability concepts in engineering planning and design[M]. New York: Wiley, 1975.
|
[7] |
廖少明 . 圆形隧道纵向剪切传递效应研究 [D]. 上海 : 同济大学 , 2002. (LIAO Shao-ming. Research on the effect of longitudinal shear transfer on circular tunnel lining[D]. Shanghai: Tongji University , 2002. ( in Chinese))
|
[8] |
朱合华 , 桥本正 , 杨林德 , 等 . 盾构隧道管片接头衬砌系统的两种受力设计模型 [J]. 工程力学 . 1996(A03): 395 – 399. (ZHU He-hua , HASHIMOTO, YANG Lin-de. Two design model for shield lining segments and Joint system[J]. Engineering Mechanics, 1996(A03) : 395 – 399. ( in Chinese))
|
[9] |
小泉淳,村上博智,西野健三 . ツ-ルドトネルの軸方向特性のモデルイヒにつぃて [J]. 土木学会論文集 . 1988: 79 – 88. (KOIZUMI J, MURAKAMI H, NISHINO K. Study on the analytical model of shield tunnel in longitudinal direction[J]. Journal of Geotechnical Engineering, 1988: 79 – 88. (in Japanese))
|
[10] |
志波由纪夫,川島一彦,大日方尚己,等 . 応答変位法にょるツ-ルドトンネルの耐震設計法 [J]. 土木技術資料 , 1986, 28 (5): 45 – 50. (SHIWA Y, KAWA SHIMA K, SHANG. Evaluation procedure for seismic stress developed in shield tunnels eismi deformation method[J]. Journal of Structure Mechanics and Earthquake Engineering, 1986, 28 (5): 45 – 50. (in Japanese))
|
[11] |
樊振宇 . 软土盾构隧道衬砌结构计算方法及纵向变形分析 [D]. 上海 : 同济大学 , 2009. (FAN Zheng-yu. Calculation method and deformation analysis on the longitudinal settlement of shield tunnel[D]. Shanghai : Tongji University , 2005. (in Chinese))
|
[12] |
FAN Zheng-yu, ZHANG Dong-mei, HUANG Hong-wei. Safety analysis on longitudinal settlement and crack width of shield tunnel segments in operation period[C]// Progress in Safety Science and Technology. Beijing, 2008.
|
[13] |
DBJ08 — 50 — 96 盾构法隧道防水技术规程 [S]. 1996. (DBJ08 — 50 — 96 Waterproof technical rules for shield-driven tunnel[S]. 1996. (in Chinese))
|
[14] |
GB50157 — 92 地下铁道设计规范 [S]. 1993. (GB50157-92 Design code for subway[S]. 1993. (in Chinese))
|
[15] |
GB50299 — 1999 地下铁道工程施工及验收规范 [S]. 1999. (GB50299 — 1999 Code for construction and acceptance of subway[S]. 1999. (in Chinese))
|
[1] | Field test insights on mechanical behavior of ground around a large deformed shield tunnel rehabilitated by grouting[J]. Chinese Journal of Geotechnical Engineering. DOI: 10.11779/CJGE20240680 |
[2] | FAN Ke-wei, LIU Si-hong, XU Si-yuan, WANG Jian-lei. Field tests on retaining wall constructed with soilbags filled with clayey soils[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(12): 2341-2348. DOI: 10.11779/CJGE201812024 |
[3] | SHAO Sheng-jun, LI Jun, LI Guo-liang, WANG Xin-dong, JIN Bao-cheng, SHAO Shuai. Field immersion tests on tunnel in large-thickness collapsible loess[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(8): 1395-1404. DOI: 10.11779/CJGE201808004 |
[4] | LIAO Shao-ming, MEN Yan-qing, XIAO Ming-qing, ZHANG Di. Field tests on longitudinal stress relaxation along shield tunnel in soft ground[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(5): 795-803. DOI: 10.11779/CJGE201705003 |
[5] | GUO Chao, FU Bai-yong, YUAN Hong, GONG Wei-ming. Application and field tests of cap-pile combined foundation with reversed construction[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(11): 2085-2092. DOI: 10.11779/CJGE201611019 |
[6] | LIAO Shao-ming, MEN Yan-qing, ZHAO Guo-qiang, XU Wei-zhong. Mechanical behaviors and field tests of steel sleeves during shield receiving[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(11): 1948-1956. DOI: 10.11779/CJGE201611003 |
[7] | LIAO Shao-ming, MEN Yan-qing, ZHANG Di, XU Yong. Field tests on mechanical behaviors during assembly of segmental linings of Qianjiang tunnel[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(1): 156-164. DOI: 10.11779/CJGE201501019 |
[8] | HE Changming, ZOU Jinfeng, LI Liang. Field tests on measurement of dynamic stress of dynamic compaction[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(4): 628-632. |
[9] | GARTUNG Erwin, HENKEN MELLIES Ulrich, RAMKE Hans Gunter, HU Yifeng. Field tests on landfill covers for evaluation of performance of mineral cover systems[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(3): 403-409. |
[10] | ZHANG Mingju, GUO Zhongxian. Research on behaviors of soil nailing by field test[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(3): 319-323. |