| Citation: | LIU Hong, LI Panfeng, ZHANG Zhuoyuan. Prediction of the post-construction settlement of the high embankment of Jiuzhai-Huanglong airport[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(1): 90-93. |
| [1] | DONG Qing, CHEN Su, LI Xiaojun, DONG Yun, CHEN Yadong, ZHOU Zhenghua, ZHU Jun. Multi-dimensional implementation of logarithmic dynamic skeleton constitutive model and its application in ABAQUS[J]. Chinese Journal of Geotechnical Engineering, 2025, 47(1): 192-199. DOI: 10.11779/CJGE20231021 |
| [2] | DONG Qing, SU Jie, ZHOU Zheng-hua, LI Xiao-jun. Time-domain constitutive model based on logarithmic skeleton curve and its application[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(8): 1491-1498. DOI: 10.11779/CJGE202008014 |
| [3] | FENG Huai-ping, GENG Hui-ling, HAN Bo-wen, SHANG Wei-dong, CHANG Jian-mei. Prediction model for settlement of high-speed railway embankment in unsaturated areas[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(6): 1089-1095. DOI: 10.11779/CJGE201706015 |
| [4] | LIU Zheng-hong, ZHENG Jian-guo, ZHANG Ji-wen, QI Chang-jun. Method for post-construction settlement of pile foundation of bridges in collapsible loess area[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(2): 320-326. DOI: 10.11779/CJGE201402008 |
| [5] | ZHANG Yu-ting, KOU Xiao-qiang, ZUO Dian-jun, QIAO Xiao-li. Numerical simulation of disturbance characteristics and post-construction settlement caused by shield excavation in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 753-757. |
| [6] | ZHANG Jun-hui, HUANG Xiang-ning, ZHENG Jian-long, WEI Jian-ming, XU Xian-jin. Centrifugal model tests on post-construction settlement of high embankment of Hechi Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(4): 773-778. |
| [7] | Zhu Cai-hui, LI Ning, LIU Ming-zhen, WEI Yi-feng. Spatiotemporal laws of post-construction settlement of loess-filled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(2): 293-301. |
| [8] | SI Hai-yan, CHANG Hong-tao, CHEN Quan-ying, YE Guan-bao, TIAN Guo-li. Centrifugal model tests on D-M method[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 399-402. |
| [9] | Field tests on post-construction settlement of DJMP composite foundation[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3). |
| [10] | ZHANG Huiming, XU Yusheng, ZENG Qiaoling. Deformation behavior of Shenzhen soft clay and post-construction settlement[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(4): 509-514. |