Citation: | HAN Xuan, ZHANG Nairui. In-situ tests on load transfer mechanism of group piled foundation in Beijing[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(1): 74-80. |
[1] | ZHANG Kunbiao, WANG Yimin, CHEN Yekai, QIU Shen, YI Hao, ZENG Zhaoyu. Mechanism of reinforcement of squeezed branch piles for deep soft foundation based on load bearing capacities[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(S2): 97-102. DOI: 10.11779/CJGE2024S20009 |
[2] | WEI Xing, CHENG Shitao, XIE Xiangyan, CHEN Rui. SPH-FEM simulation of landslide induced by earthquake considering velocity weakening effect of frictional strength[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(8): 1753-1761. DOI: 10.11779/CJGE20230463 |
[3] | LIANG Jian-wen, ZHU Jun. FEM-IBEM coupling method for nonlinear seismic response analysis of underground structures in water-saturated soft soils[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(11): 1977-1987. DOI: 10.11779/CJGE201811003 |
[4] | QIU Chang-lin, WANG Jing, YAN Shu-wang. Coupled DEM-FEM analysis of submarine pipelines with rock armor berm under impact load[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(11): 2088-2093. DOI: 10.11779/CJGE201511021 |
[5] | LIU Zhong-xian, WANG Dong. Effect of different wave velocity models on seismic response of alluvial valley based on FEM-IBIEM[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(7): 1289-1301. DOI: 10.11779/CJGE201407013 |
[6] | CHEN Fei, WU Kai-xing, HE Shu. Field tests on load transfer performances of squeezed branch piles[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 990-993. |
[7] | ZHANG Zhi-guo, HUANG Mao-song, WANG Wei-dong. DCBEM-FEM coupling method for response analysis of adjacent pipelines due to tunneling[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(10): 1554-1561. |
[8] | ZHENG Gang, DIAO Yu, NG C W W. Finite element analysis on mechanism of effect of extra-deep excavation on vertical load transfer and settlement of a single pile[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(6): 837-845. |