• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
PAN Wei-qiang. Monitoring and analysis of ground settlement during pipe roof construction of pipe-jacking groups in soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 201-204. DOI: 10.11779/CJGE2019S1051
Citation: PAN Wei-qiang. Monitoring and analysis of ground settlement during pipe roof construction of pipe-jacking groups in soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 201-204. DOI: 10.11779/CJGE2019S1051

Monitoring and analysis of ground settlement during pipe roof construction of pipe-jacking groups in soft soil areas

More Information
  • Received Date: April 29, 2019
  • Published Date: July 14, 2019
  • Based on the example project of the pipe roof section of Guiqiao Road Station on Shanghai Line 14, the ground settlement of the pipe roof is monitored during pipe-jacking construction process. At the same time, the influences of pipe-jacking group construction on the ground settlement are analyzed, and the methods for calculating the water pressure and soil pressure are discussed. According to the actual working conditions and the monitoring data of the jacking process, the reasons for the influences of the pipe-jacking construction on the ground are analyzed, and the corresponding control measures are proposed. Some conclusions are drawn as follows: (1) The maximum ground settlement caused by the pile jacking construction occurs in the area outside the reinforcement zone. (2) The calculation of the frontal soil pressure using water and soil is more in line with the actual situation in this project. (3) The factors affecting the ground deformation during the pipe jacking construction process mainly include the front cabin pressure, the jacking speed, the tightness of the hole, the pipe friction and the synchronous grouting.
  • [1]
    关永平. 地铁暗挖车站STS管幕支护结构的力学性能研究[D]. 沈阳: 东北大学, 2015.
    (GUAN Yong-ping.Research on mechanical property of the STS structure used to construct shallow buried subway station[D]. Shenyang: Northeastern University, 2015. (in Chinese))
    [2]
    刘应亮. 大直径曲线管幕顶进过程中地层变形控制及监测[J]. 现代隧道技术, 2017, 54(6): 210-216.
    (LIU Ying-liang.Control and monitoring of ground deformation during jacking of a large-diameter curved tabular roof[J]. Journal of Northeastern University, 2017, 54(6): 210-216. (in Chinese))
    [3]
    李慎刚, 韩健勇, 石建军, 等. STS新管幕工法钢管顶进现场试验[J]. 东北大学学报, 2016, 37(10): 1469-1473.
    (LI Shen-gang, HAN Jian-yong, SHI Jian-jun, et al.Field test on steel pipe jacking by STS method[J]. Rock and Soil Mechanics, 2016, 37(10): 1469-1473. (in Chinese))
    [4]
    陈韶章, 苏宗贤. 韩国最大暗挖地铁车站施工技术[J]. 施工技术, 2012, 41(2): 46-49, 101.(CHEN Shao-zhang, SU Zong-xian. The largest tunnel station in Korea the express bus terminal subway station, Lot 913, Seoul Subway Line 9[J]. Construction Technology, 2012, 41(2): 46-49, 101. (in Chinese))
    [5]
    黎永索, 张可能, 黄常波, 等. 管幕预筑隧道地表沉降分析[J]. 岩土力学, 2011, 32(12): 3701-3707.
    (LI Yong-suo, ZHANG Ke-neng, HUANG Chang-bo, et al.Analysis of surface subsidence of tunnel built by pipe-roof pre-construction method[J]. Rock and Soil Mechanics, 2011, 32(12): 3701-3707. (in Chinese))
  • Related Articles

    [1]AN Peng, ZHANG Jie, NI Wankui, MA Xinchao, HU Xingqun, ZHANG Changbo. Settlement and deformation characteristics of high fill of Luojiahe expansive soil in Ankang Airport[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(4): 833-839. DOI: 10.11779/CJGE20220071
    [2]LI Bin, GAO Chao, ZHANG Jia-ying. Instantaneous settlement of immersed tube tunnel of Hong Kong-Zhuhai-Macao Bridge[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S2): 263-266. DOI: 10.11779/CJGE2021S2062
    [3]XIE Xiong-yao, YI Cheng-min, LI Wei-ping, FANG Yong-gang. Safety analysis of settlement monitoring data of joints of Yongjiang immersed tube tunnel during operation period[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(12): 2338-2344. DOI: 10.11779/CJGE201912020
    [4]HUANG Qi-huan, WANG Qing-qing, HE Ning, WANG Yi-an, ZHOU Yan-zhang. Monitoring time-series settlements of breakwaters based on PSI[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(4): 761-768. DOI: 10.11779/CJGE201904021
    [5]WANG Wei, XU Kai, WANG Hai-long, LI Lu-lu. Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(s1): 85-90. DOI: 10.11779/CJGE2017S1017
    [6]Zhu Cai-hui, LI Ning, LIU Ming-zhen, WEI Yi-feng. Spatiotemporal laws of post-construction settlement of loess-filled foundation of Lüliang Airport[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(2): 293-301.
    [7]Settlement of overlaying soil caused by decompression of confined water[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(1).
    [8]YANG Youhai, WANG Jianjun, WU Jinguang, LI Changshan. Informationized construction monitoring analysis of deep foundation pit for Qiutao Road station of Hangzhou Metro[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(10): 1550-1554.
    [9]HU Qunfang, HUANG Hongwei. Analysis and monitoring on shield tunneling under existing adjacent tunnel[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(1): 42-47.
    [10]KE Han, CHEN Yunmin. Calculation of post-closure settlement of landfills[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(6): 742-746.

Catalog

    Article views (206) PDF downloads (110) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return