Citation: | XIE Xiong-yao, YI Cheng-min, LI Wei-ping, FANG Yong-gang. Safety analysis of settlement monitoring data of joints of Yongjiang immersed tube tunnel during operation period[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(12): 2338-2344. DOI: 10.11779/CJGE201912020 |
[1] |
刘鹏, 丁文其, 金跃郎, 等. 沉管隧道接头三维非线性刚度力学模型[J]. 同济大学学报(自然科学版), 2014, 42(2): 232-237.
(LIU Peng, DING Wen-qi, JIN Yue-lang, et al.Three-dimensional nonlinear stiffness mechanics model of immersed tube tunnel joints[J]. Journal of Tongji University (Natural Science Edition), 2014, 42(2): 232-237. (in Chinese)) |
[2] |
刘鹏, 丁文其, 杨波. 考虑接头力学特性的沉管隧道计算方法[J]. 中南大学学报(自然科学版), 2014(6): 1983-1991.
(LIU Peng, DING Wen-qi, YANG Bo, et al.Calculation method of immersed tube tunnel considering mechanical properties of joints[J]. Journal of Central South University (Natural Science Edition), 2014(6): 1983-1991. (in Chinese)) |
[3] |
萧文浩, 徐国平, 禹海涛, 等. 沉管隧道大比尺管节接头压弯试验研究[J]. 结构工程师, 2014(5): 181-186.
(XIAO Wen-hao, XU Guo-ping, YU hai-tao, et al. Experimental study on bending of large-scale pipe joints in immersed tunnel[J]. Structural Engineer, 2014(5): 181-186. (in Chinese)) |
[4] |
禹海涛, 袁勇, 刘洪洲, 等. 沉管隧道接头力学模型及刚度解析表达式[J]. 工程力学, 2014, 31(6): 145-150.
(YU Hai-tao, YUAN Yong, LIU Hong-zhou, et al.Mechanics model and rigidity analytical formula of immersed tube tunnel joints[J]. Engineering Mechanics, 2014, 31(6): 145-150. (in Chinese)) |
[5] |
胡指南, 谢永利, 来弘鹏, 等. 沉管隧道节段接头剪力键破坏状态与机理研究[J]. 建筑结构, 2015(1): 77-81.
(HU Zhi-nan, XIE Yong-li, LAI Hong-peng, et al.Study on failure state and mechanism of shear keys in section joints of immersed tube tunnel[J]. Building Structure, 2015(1): 77-81. (in Chinese)) |
[6] |
武义凯, 谢永利. 沉管隧道的ANASYS三维有限元分析研究[J]. 西安科技大学学报, 2014, 34(3): 296-301.
(WU Yi-kai, XIE Yong-li.ANASYS three-dimensional finite element analysis of Immersed Tunnel[J]. Journal of Xi'an University of Science and Technology, 2014, 34(3): 296-301. (in Chinese)) |
[7] |
黄帆. 沉管隧道GINA橡胶止水带数值模拟分析[J]. 结构工程师, 2010, 26(1): 96-102.
(HUANG Fan.Numerical simulation and analysis of GINA rubber water stop belt in immersed tunnel[J]. Structural Engineer, 2010, 26(1): 96-102. (in Chinese)) |
[8] |
刘正根, 黄宏伟, 张冬梅. 沉管隧道接头三维非线性数值模拟[J]. 地下空间与工程学报, 2011, 7(4): 691-694.
(LIU Zheng-gen, HUANG Hong-wei, ZHANG Dong-mei.Three-dimensional nonlinear numerical simulation of immersed tube tunnel joints[J]. Journal of Underground Space and Engineering, 2011, 7(4): 691-694. (in Chinese)) |
[9] |
唐英, 管敏鑫, 万晓燕. 沉管隧道接头的理论分析及研究[J]. 中国铁道科学, 2002, 23(1): 67-72.
(TANG Ying, GUAN Min-xing, WANG Xiao-yan.Theoretical analysis and research on the joint of immersed tube tunnel[J]. Railway Science in China, 2002, 23(1): 67-72. (in Chinese)) |
[10] |
谢雄耀, 王培, 李永盛, 等. 甬江沉管隧道长期沉降监测数据及有限元分析[J]. 岩土力学, 2014(8): 2314-2324.
(XIE Xiong-yao, WANG Pei, LI Yong-sheng, et al.Long-term settlement monitoring data and finite element analysis of Yongjiang immersed tunnel[J]. Geotechnical Mechanics, 2014(8): 2314-2324. (in Chinese)) |
[11] |
刘洪洲, 张志刚, 柴瑞, 等. 沉管隧道节段接头作用机理及构造形式探讨[J]. 公路, 2015(4): 27-32.
(LIU Hong-zhou, ZHANG Zhi-gang, CHAI Rui, et al.Discussion on the mechanism and structure form of segment joint of immersed tube tunnel[J]. Highway, 2015(4): 27-32. |
1. |
杨威. 基于原位测试方法的土体变形参数研究. 安徽建筑. 2024(04): 141-143 .
![]() | |
2. |
黄献文,姚直书,蔡海兵,李凯奇,唐楚轩. 基于微观结构重塑的非饱和冻土导热系数预测. 岩土力学. 2023(01): 193-205 .
![]() | |
3. |
陈磊. 基于静力触探测试的深基坑工程土体设计参数应用研究. 广东建材. 2023(04): 72-75 .
![]() | |
4. |
张德,张泽超,张璐璐,张洁,曹子君. 场地有限数据条件下土体不排水抗剪强度的概率分布的贝叶斯估计研究. 岩土工程学报. 2023(06): 1259-1268 .
![]() | |
5. |
曹阳健. 基于原位测试方法的土体变形参数研究. 砖瓦. 2023(06): 66-69 .
![]() | |
6. |
汪明元,张国,潘孙珏徐,陶袁钦. 基于集合卡尔曼滤波的海洋土孔隙率预测研究. 工业建筑. 2023(06): 37-42 .
![]() | |
7. |
黄献文,赵光明,黄顺杰,王泽洲,王雪松,唐楚轩. 基于堆积颗粒几何特征的多尺度渗透注浆扩散半径预测. 岩石力学与工程学报. 2023(08): 2028-2040 .
![]() | |
8. |
柯琪睿,李长冬,姚文敏,范一博,李炳辰. 干湿循环下侏罗系软弱夹层剪切特性与抗剪强度参数概率表征. 水利水电技术(中英文). 2023(11): 192-204 .
![]() |