Citation: | YAN Shu-wang, LIN Shu, JIA Zhao-lin, LANG Rui-qing. Large-scale direct shear tests on shear strength of interface between marine soil and steel piles[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(3): 495-501. DOI: 10.11779/CJGE201803013 |
[1] |
POTYONDY J G.Skin friction between various soils and construction materials[J]. Géotechnique, 1961, 11(4): 339-353.
|
[2] |
LINGS M L, DIETZ M S.The peak strength of sand-steel interfaces and the role of dilation[J]. Soils and Foundations -Tokyo, 2005, 45(6): 1-14.
|
[3] |
MORTARA G, MANGIOLA A, GHIONNA V N.Cyclic shear stress degradation and post-cyclic behaviour from sand-steel interface direct shear tests[J]. Canadian Geotechnical Journal, 2007, 44(7): 739-752.
|
[4] |
胡黎明, 濮家骝. 土与结构物接触面物理力学特性试验研究[J]. 岩土工程学报, 2001(4): 431-435.
(HU Li-ming, PU Jia-liu.Experimental study on mechanical characteristics of soil-structure interface[J]. Chinese Journal of Geotechnical Engineering, 2001(4): 431-435. (in Chinese)) |
[5] |
张嘎, 张建民. 循环荷载作用下粗粒土与结构接触面变形特性的试验研究[J]. 岩土工程学报, 2004(2): 254-258.
(ZHANG Ga, ZHANG Jian-min.Experimental study on cyclic behavior of interface between soil and structure[J]. Chinese Journal of Geotechnical Engineering, 2004(2): 254-258. (in Chinese)) |
[6] |
夏红春, 周国庆, 杜泽超. 土-地下结构界面层效应试验研究[J]. 中国矿业大学学报, 2011(6): 846-851.
(XIA Hong-chun, ZHOU Guo-qing, DU Ze-chao.Experimental study of the soil-underground structure interfacial layer effect[J]. Journal of China University of Mining and Technology, 2011(6): 846-851. (in Chinese)) |
[7] |
李永辉, 王卫东, 黄茂松, 郭院成. 超长灌注桩桩-土界面剪切试验研究[J]. 岩土力学, 2015(7): 1981-1988.
(LI Yong-hui, WANG Wei-dong, HUANG Mao-song, GUO Yuan-cheng.Experimental research on pile-soil interface shear behaviors of super-long bored pile[J]. Rock and Soil Mechanics, 2015(7): 1981-1988. (in Chinese)) |
[8] |
卢廷浩, 王伟, 王晓妮. 土与结构接触界面改进直剪试验研究[J]. 沈阳建筑大学学报(自然科学版), 2006(1): 82-85, 99. (LU Ting-hao, WANG Wei, WANG Xiao-ni. Experimental study on soil-structure contact surface behavior by improved direct shear tests[J]. Journal of Shenyang Jianzhu University (Natural Science), 2006(1): 82-85, 99. (in Chinese))
|
[9] |
周凯, 程寅, 黄新. 不同桩-土界面直剪试验研究[J]. 路基工程, 2011, 5: 93-95, 99.(ZHOU Kai, CHENG Yin, HUANG Xin. Experimental study on direct shear of different pile-soil interface[J]. Subgrade Engineering, 2011, 5: 93-95, 99. (in Chinese))
|
[10] |
TERZAGHI K.Theoretical soil mechanics[M]. New York: Wiley, 2007.
|
[11] |
杨大方. 土与结构界面模型单剪与直剪试验对比研究[D]. 焦作: 河南理工大学, 2009.
(YANG Da-fang.Comparison research between simple shear tests and direct shear tests on interfacial model between soil and structure[D]. Jiaozuo: Institutes of Technology of Henan, 2009. (in Chinese)) |
[12] |
殷勇, 李富荣. 滨海土体与钢材接触面剪切特性试验[J]. 土工基础, 2014(6): 123-125.
(YIN Yong, LI Fu-rong.The shear properties of the contact surface between steel and coastal plain soil[J]. Soil Engineering And Foundation, 2014(6): 123-125. (in Chinese)) |
[1] | ZHONG Hua, ZHANG Bin, ZHANG Shou-jie, YU Ning, SU An-shuang. Structure and construction of sunken fascine mattress on ice[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(zk1): 189-194. DOI: 10.11779/CJGE2016S1036 |
[2] | WEN Ying-wen, HU Ming-liang, HAN Shun-you, LIU Song-yu. Application of static bolt-pile technique to construction of basement of existing buildings[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 224-229. |
[3] | XU Kai-jun, YANG Hong-po, WU Zheng-guang. Application of partial top-down construction of excavations under complex environment[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 649-653. |
[4] | LUO Zhanyou, GONG Xiaonan, ZHU Xiangrong. Soil displacements around jacked group piles based on construction sequence and compacting effects[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(6): 824-829. |
[5] | NAN Chen, ZHANG Mingqing. Construction technology of underground river section of Wuzhaoguan tunnel[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(6): 948-953. |
[6] | LIU Songyu, JING Fei. Settlement prediction of embankments with stage construction on soft ground[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(2): 228-232. |
[7] | ZHANG Zhiqiang, HE Chuan. Study on the mechanical behaviour of a metro tunnel construction adjacent to existing pile foundations in Shenzhen[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(2): 204-207. |
[8] | PENG Daofu, LI Zhongxian. Study on TBM boring technique for construction of super long tunnel[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(2): 179-183. |
[9] | LI Shiren, CHEN Dewen. Construction techniques of long bored pile embedded in rock[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(6): 741-745. |
[10] | Li Shucai, Zhu Weishen, Zhang Yujun. Research on construction sequence majorization for a group of carverns in joined rockmass[J]. Chinese Journal of Geotechnical Engineering, 1998, 20(1): 1-4. |
1. |
王斌. 双桥静力触探试验在静压桩沉桩阻力估算中的应用. 林业建设. 2024(06): 66-72 .
![]() | |
2. |
周君栋. 混凝土板桩施工技术在京杭运河航道杭州段整治工程中的应用. 工程技术研究. 2022(01): 80-83 .
![]() |