SHAN Ren-liang, DONG Hong-guo, CHEN Dai-kun. Numerical analysis of instability soil-nailing wall in deep foundation pits containing soft soil layer at middle and deep parts[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 30-35. DOI: 10.11779/CJGE2014S2006
Citation: SHAN Ren-liang, DONG Hong-guo, CHEN Dai-kun. Numerical analysis of instability soil-nailing wall in deep foundation pits containing soft soil layer at middle and deep parts[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 30-35. DOI: 10.11779/CJGE2014S2006

Numerical analysis of instability soil-nailing wall in deep foundation pits containing soft soil layer at middle and deep parts

More Information
  • Received Date: July 27, 2014
  • Published Date: July 27, 2014
  • The FLAC3D software is adopted to simulate and analyze the project based on some unstable and damage phenomena such as fracture of top soils of side slope and collapse of bottom soils of side slope during stagged excavating and construction of soil-nailing wall in a deep foundation pit of the building of Beijing Science Park of China National Nuclear Corporation. In order to ensure the reality of the numerical simulation approach, several factors are considered, in duding distribution of soil layers, gradient of side slope, arrangement pattern of soil nails, reinforced steel shotcrete surface, pore water pressure of aquifer, stagged excavation and support. According to the size of the deep foundation pit, the corresponding three-dimensional model is established. The Mohr-Coulomb elastic-plastic model is used to compute the displacement deformation of side slope at different excavation and support stages, and the displacement deformation nephogram of the whole deep foundation pit and the maximum displacement cross-section are acquired through the post-processing procedure. The horizontal displacement and settlement at several key nodes are recorded. The horizontal displacement and settlement of side slope caused by excavation and support in actual project are measured. The numerical results with are compared the measured data to determine the approximate position of potential sliding surface and collapse in the deep foundation pit. Thus it may offer some important reference for improving supporting pattern for the area with large the displacement in the design.
  • [1]
    陈肇元, 崔京浩. 土钉支护在基坑工程中的应用[M]. 2版. 北京: 中国建筑工业出版社, 2000. (CHEN Zhao-yuan, CUI Jing-hao. Application of soil nailing in foundation pit engineering[M]. 2nd ed. Beijing: China Architecture & Building Press, 2000. (in Chinese))
    [2]
    连镇营, 韩国城, 吕凯歌. 土钉支护弹塑性数值分析及稳定性探讨[J]. 岩土工程学报, 2002, 23(1): 85-89. (LIAN Zhen-ying, HAN Guo-cheng, LÜ Kai-ge. Elastoplastic numerical analysis and stability study of soil-nailed wall[J]. Chinese Journal of Geotechnical Engineering, 2002, 23(1):85-89.(in Chinese))
    [3]
    张明敏. 深基坑复合土钉墙支护FLAC 3D 模拟与现场测试研究[D]. 北京: 中国地质大学, 2011. (ZHANG Ming-min. FLAC 3D Simulation and field testing of deep excavation supported by soil nail walls[D]. Beijing: China University of Geosciences, 2011. (in Chinese))
    [4]
    刘继国, 曾亚武. FLAC 3D 在深基坑开挖与支护数值模拟中的应用[J]. 岩土力学, 2006, 27(3): 505-508. (LIU Ji-guo, ZENG Ya-wu. Application of FLAC 3D to simulation of foundation excavation and support[J]. Rock and Soil Mechanics, 2006, 27(3):505-508. (in Chinese))
    [5]
    丁勇春, 王建华, 徐 斌. 基于FLAC 3D 的基坑开挖与支护三维数值分析[J]. 上海交通大学学报, 2009, 43(6): 976-980. (DING Yong-chun, WANG Jian-hua, XU Bin. Three- Dimensional numerical analysis of braced excavation based on FLAC 3D [J]. Journal of Shanghai Jiao tong University, 2009, 43(6): 976-980. (in Chinese))
    [6]
    吴忠诚, 汤连生, 廖志强, 等. 深基坑复合土钉墙支护FLAC-3D模拟及大型现场原位测试研究[J]. 岩土工程学报, 2006, 28: 1460-1465. (WU Zhong-cheng, TANG Lian-sheng, LIAO Zhi-qiang, et al. FLAC-3D simulation of deep excavation with compound soil nailing support[J]. Chinese Journal of Geotechnical Engineering, 2006, 28: 1460-1465. (in Chinese))
    [7]
    俞登华, 尹 骥. 复合土钉支护基坑位移和稳定性的有限元分析[J]. 岩土工程学报, 2010, 32(增刊1): 161-165. (YU Deng-hua, YIN Ji. Finite element analysis of the displacement and stability of composite soil nailed foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 161-165. (in Chinese))
    [8]
    赵延林, 安伟光. 基于可靠性的复合土钉支护基坑稳定性分析[J]. 哈尔滨工业大学学报, 2011, 32(10): 1300-1304. (ZHAO Yan-lin, AN Wei-guang. Reliability-based stability analysis of a foundation pit supported by composite soil nailing[J]. Journal of Harbin Engineering University, 2011, 32(10): 1300-1304. (in Chinese))
  • Related Articles

    [1]ZHANG Yan-feng, HOU Yong-mei, ZHANG Ting-ting. Zhengzhou 1st section of The South-to-North Water Diversion Project engineering seepage control and drainage design research[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(zk1): 69-73. DOI: 10.11779/CJGE2016S1012
    [2]LI Ling, CHENG Shao-ping, WANG Bin, GAO Xu, LIU Xian-wu. Design and construction monitoring of supporting structures for foundation pit of Lefutianxia Building in Xiangyang[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 132-137. DOI: 10.11779/CJGE2014S1023
    [3]CHEN Yan-ming, MA Yan-yan, XU Yan-ping, CHEN Wei-yun, XIA Tang-dai. Comparative analysis of precast square piles and PHC piles for flood protection work in soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 986-989.
    [4]HAO Zhi-chao, SHEN Yu-peng, ZHANG Yao-yu. Comparative studies on treatment effects of new methods for dredger fill foundation[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 579-583.
    [5]REN Yong-zhong, ZHU Yan-peng, ZHOU Yong. Design and monitoring of bracings for a deep foundation pit in Lanzhou[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 705-710.
    [6]TANG Jun. Design and analysis of retaining structures for a super-deep excavationin Shanghai using late-dismantling support[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 451-455.
    [7]HUANG Xue-feng, YANG Xiao-hui, ZHU Yan-peng, ZHANG Shi-jing. Comparative analysis of common retaining structures in Xining area[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 432-439.
    [8]TAN Zhongsheng, YU Yu, WANG Mingnian, WANG Mengshu. Comparative tests on section steel and steel grid for loess tunnels with large section[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 628-633.
    [9]PAN Hong, ZENG Lvxian. Researches on ring beam retaining structure of deep foundation pit by spacial analytical method[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(7): 849-852.
    [10]LU Peiyi, LIU Chang, GU Xiaolu. Researches on bracing system of foundation pit using simplified space analytical method[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(4): 471-474.

Catalog

    Article views (333) PDF downloads (317) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return