Citation: | YE Fei, GOU Chang-fei, CHEN Zhi, MAO Jia-hua, YANG Peng-bo, JIA Tao. Ground surface deformation caused by synchronous grouting of shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(4): 618-624. DOI: 10.11779/CJGE201404004 |
[1] |
黄宏伟, 张冬梅. 盾构隧道施工引起的地表沉降及现场监控[J]. 岩石力学与工程学报, 2001, 20(增刊1): 1814-1820. (HUANG Hong-wei, ZHANG Dong-mei. Shield tunnelling induced surface settlement and in-situ monitoring[J]. Chinese Journal of Rock Mechanics and Engineering, 2001, 20(S1): 1814-1820. (in Chinese))
|
[2] |
PECK R B. Deep excavations and tunnelling in soft ground[C]// Proc 7th Int Conf SMFE Mexico City State of the Art Volume, 1969: 225-290.
|
[3] |
ATTEWELL P B, YEATES J, SELBY A R. Soil movements induced by tunnelling and their effects on pipelines and structures[M]. Glasgow: Blackie, 1986: 10-50.
|
[4] |
RANKIN W J. Ground movement resulting from urban tunnelling: predictions and effects[C]// Bell eds.Engineering Geology of Underground Movements. Proc of the 23rd Annual Conf of the Eng.[s. l.]:[s. n.], 1988: 79-92.
|
[5] |
韩煊, 李宁, STANDING J R. Peck公式在我国隧道施工地面变形预测中的适用性分析[J]. 岩土力学, 2007, 28(1): 23-35. (HAN Xuan, LI Ning, STANDING J R. An adaptability study of Gaussian equation applied to predicting ground settlements induced by tunneling in China[J]. Rock and Soil Mechnics, 2007, 28(1): 23-35. (in Chinese))
|
[6] |
王立忠, 吕学金. 复变函数分析盾构隧道施工引起的地表变形[J]. 岩土工程学报, 2007, 29(3): 319-327. (WANG Li-zhong, LÜ Xue-jin. A function of complex variable solution for different kinds of oval deformation around circular tunnel in an elastic half plane[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(3): 319-327. (in Chinese))
|
[7] |
魏纲, 徐日庆. 软土隧道盾构施工引起的纵向地面变形预测[J]. 岩土工程学报, 2005, 27(9): 1077-1081. (WEI Gang, XU Ri-qing. Prediction of longitudinal ground deformation due to tunnel construction with shield in soft soil[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(9): 1077-1081. (in Chinese))
|
[8] |
魏纲, 张世民, 齐静静, 等. 盾构隧道施工引起的地面变形计算方法研究[J]. 岩石力学和工程学报, 2006, 25(增刊1): 3317-3323. (WEI Gang, ZHANG Shi-min, QI Jing-jing, et al. Study on calculation method of ground deformation induced by shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(S1): 3317-3323. (in Chinese))
|
[9] |
唐晓武, 朱季, 刘维, 等. 盾构施工过程中的土体变形研究[J]. 岩石力学与工程学报, 2010, 29(2): 417-422. (TANG Xiao-wu, ZHU Ji, LIU Wei, et al. Research on soil deformation during shield construction process[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(2): 417-422. (in Chinese))
|
[10] |
朱忠隆, 张庆贺, 易宏传. 软土隧道纵向地表沉降的随机预测方法[J]. 岩土力学, 2001, 22(1): 56-59. (ZHU Zhong-long, ZHANG Qing-he, YI Hong-chuan. Stochastic theory for predicting longitudinal settlement in soft-soil tunnel[J]. Rock and Soil Mechanics, 2001, 22(1): 56-59. (in Chinese))
|
[11] |
施成华, 彭立敏. 随机介质理论在盾构法隧道纵向地表沉降预测中的应用[J]. 岩土力学, 2004, 25(2): 320-323. (SHI Cheng-hua, PENG Li-min. Application of stochastic medium theory to predicting settlement in longitudinal surface due to tunnel construction by shield[J]. Rock and Soil Mechanics, 2004, 25(2): 320-323. (in Chinese))
|
[12] |
张海波, 殷宗泽, 朱俊高. 地铁隧道盾构法施工过程中地层变位的三维有限元模拟[J]. 岩石力学与工程学报, 2005, 24(5): 755-760. (ZHANG Hai-bo, YIN Zong-ze, ZHU Jun-gao. 3D finite element simulation on deformation of soil mass during shield tunneling[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(5): 755-760. (in Chinese))
|
[13] |
张云, 殷宗泽, 徐永福. 盾构法隧道引起的地表变形分析[J]. 岩石力学与工程学报, 2002, 21(3): 388-392. (ZHANG Yun, YIN Zong-ze, XU Yong-fu. Analysis on three-dimensional ground surface deformations due to shield tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(3): 388-392. (in Chinese))
|
[14] |
谢自韬, 江玉生, 刘品. 盾构隧道壁后注浆压力对地表沉降及围岩变形的数值模拟研究[J]. 隧道建设, 2007, 27(4): 12-15. (XIE Zi-tao, JIANG Yu-sheng, LIU Ping. Numerical simulation study on surface settlement and surrounding rock deformation caused by backfill grouting pressure in shield tunneling[J]. Tunnel Construction, 2007, 27(4): 12-15.(in Chinese))
|
[15] |
殷加顺. 盾构施工注浆对地层变形影响的有限元模拟及试验研究[D]. 天津: 天津大学, 2009. (YIN Jia-shun. The finite element simulation and experimental investigations for ground layer deformation by grouting with shield method[D]. Tianjin: Tianjin University, 2009. (in Chinese))
|
[16] |
刘招伟, 王梦恕, 董新平. 地铁隧道盾构法施工引起的地表沉降分析[J]. 岩石力学与工程学报, 2003, 22(8): 1297-1301. (LIU Zhao-wei, WANG Meng-shu, DONG Xin-ping. Analysis on ground surface subsidence of metro tunnel induced by shield construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(8): 1297-1301. (in Chinese))
|
[17] |
叶飞. 软土盾构隧道施工期上浮机理分析及控制研究[D]. 上海: 同济大学, 2007. (YE Fei. Analysis and control for upward movement of shield tunnel during construction[D]. Shanghai: Tongji University, 2007. (in Chinese))
|
[18] |
朱宁, 施建勇, 陈海丰. 一种半无限土体中圆孔扩张的分析方法[J]. 岩土力学, 2006, 27(2): 257-260. (ZHU Ning, SHI Jian-yong, CHEN Hai-feng. A method for cavity expansion in semi-infinite soil[J]. Rock and Soil Mechanics, 2006, 27(2): 257-260. (in Chinese))
|
[19] |
程昌钧, 朱媛媛. 弹性力学[M]. 上海: 上海大学出版社, 2005: 218-219. (CHENG Chang-jun, ZHU Yuan-yuan. Elasticity[M]. Shanghai: Shanghai University Press, 2005: 218-219. (in Chinese))
|
[1] | BAO Xiao-hua, FU Yan-bin, HUANG Hong-wei. Case study of risk assessment for safe grade of deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 192-197. DOI: 10.11779/CJGE2014S1033 |
[2] | WANG Ming-wu, CHEN Guang-yi, JIN Ju-liang. Risk evaluation of surrounding rock stability based on stochastic simulation of multi-element connection number and triangular fuzzy numbers[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(4): 643. |
[3] | Evaluation coupling model for high slope stability based on fuzzy analytical hierarchy process- set pair analysis method[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(5). |
[4] | TAN Xiaohui, WANG Jianguo, HU Xiaojun, BI Weihua. Fuzzy random finite element reliability analysis of slope stability[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(7): 991-996. |
[5] | LAN Shouqi, ZHANG Qinghe. Risk assessment of deep excavation during construction based on fuzzy theory[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 648-652. |
[6] | WANG Mingwu, LI Li, JIN Juliang. Set pair analysis-variable fuzzy set model for evaluation of stability of surrounding rock[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(6): 941-944. |
[7] | HUANG Hongwei, ZHU Lin, XIE Xiongyao. Risk assessment on engineering feasibility of key events in Shanghai metro line No. 11[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(7): 1103-1107. |
[8] | BIAN Yihai, HUANG Hongwei. Fuzzy fault tree analysis of failure probability of SMW retaining structures in deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(5): 664-668. |
[9] | SHEN Yusheng, ZHAO Yuguang. Research on fuzzy probability analysis of stability of surrounding rock in double-arch tunneling[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(11): 123-126. |
[10] | Lin Yuliang, Sakurai Shunsuke. A Formulation of Back Analysis Using the Fuzzy Finite Element Method[J]. Chinese Journal of Geotechnical Engineering, 1995, 17(5): 48-56. |