[1] |
《桩基工程手册》编写委员会 . 桩基工程手册 [M]. 北京 : 中国建筑工业出版社 , 1995. (The Compilation Board Of Handbook of Pile Foundations. handbook of pile foundations[M]. Beijing: China Architecture and Building Press, 1995. (in Chinese))
|
[2] |
张建新 , 刘利民 . 孔壁粗糙度对钻孔灌注桩桩侧阻力的影响 [J]. 工程勘察 , 2003(1): 13 – 15. (ZHANG Jian-xin, LIU Li-min. The effect of hole side roughness on the pile side resistance for cast-in-site piles[J]. Geotechnical Investigation and Surveying, 2003(1): 13 – 15. (in Chinese))
|
[3] |
刘利民 . 增加孔壁粗糙度提高钻孔灌注桩承载力的原理及施工措施 [J]. 建筑技术 , 2002, 33 (3): 188 – 189. (LIU Li-min. Enhanceing the bearing capacity of bored pile by improving roughness of the hole[J]. Architecture Technology, 2002, 33 (3): 188 – 189. (in Chinese))
|
[4] |
楼晓明 , 戴仁厚 , 张一鸣 . 孔壁形状对钻孔灌注桩承载特性的影响 [J]. 工程勘察 , 1998(2): 6 – 9. (LOU Xiao-ming, DAI Ren-hou, ZHANG Yi-ming. Influence of hole wall shape on bearing feature of bored pile[J]. Geotechnical Investigation and Surveying, 1998(2): 6 – 9. (in Chinese))
|
[5] |
舒 翔 , 刘利民 . 施工因素对钻孔灌注桩承载力的影响 [J]. 施工技术 , 2003, 32 (1): 25 – 27. (SHU Xiang, LIU Li-min. Influence of construction factors on bearing capacity of drilled grouting pile[J]. Construction Technology, 2003, 32 (1): 25 – 27. (in Chinese))
|
[6] |
鲁 嘉 , 黄安芳 , 赵春风 , 等 . 土层及钻机差异对灌注桩孔径变化规律的影响 [J]. 地下空间与工程学报 , 2010, 6 (2): 341 – 347. (LU Jia, HUANG An-fang, ZHAO Chun-feng. Research on effect of different soil layer character and drilling machine on variation of diameter of cavities of cast in place bored piles[J]. Chinese Journal of Under ground Space and Engineering, 2010, 6 (2): 341 – 347. (in Chinese))
|
[7] |
HORVATH R G, KENNV T C, KOZICHI P. Method of improving the performance of drilled piles in weak rock[J]. Canada Geotechnical Journal.col, 20 (4): 758 – 772.
|
[8] |
刘 琰 . 灌注桩的时间空间力学参数研究 [D]. 上海 : 同济大学 , 2006. (LIU Yan. Reseach on time-and-space mechanical parameters of cast-in-plaee pile [D]. Hangzhou: Zhejiang University, 2008. (in Chinese))
|
[9] |
林景华 . 浅谈提高钻孔灌注桩承载力的两种有效措施 [J]. 山西建筑 , 2005, 31 (14): 95 – 96. (LIN Jing-hua. Two kinds of valid measures of promoting the hole-digging grouting pile’s carrying capacity[J]. Shanxi Architecture, 2005, 31 (14): 95 – 96. (in Chinese))
|