[1] |
彭焱森. 陡倾层状岩体隧道开挖稳定性研究[D]. 重庆: 重庆交通大学, 2012. (PENG Yan-sen.Study on the stabilization of excavating the steep-dipping rock mass Tunnel[D]. Chongqing: Chongqing Jiaotong University, 2012. (in Chinese))
|
[2] |
刘恺德, 刘泉声, 朱元广, 等. 考虑层理方向效应煤岩巴西劈裂及单轴压缩试验研究[J]. 岩石力学与工程学报, 2013, 32(2): 308-316. (LIU Kai-de, LIU Quan-sheng, ZHU Yuan-guang, et al.Experimental study of coal considering directivity effect of bedding plane under brazilian splitting and uniaxial compression[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(2): 308-316. (in Chinese))
|
[3] |
朱永全, 李文江, 赵勇. 软弱围岩隧道稳定性变形控制技术[M]. 北京: 人民交通出版社, 2012. (ZHU Yong-quan, LI Wen-jiang, ZHAO Yong.Deformation control technology of weak surrounding rock tunnel stability[M]. Beijing: China Communications Press, 2012. (in Chinese))
|
[4] |
沙鹏, 伍法权, 李响, 等. 高地应力条件下层状地层隧道围岩挤压变形与支护受力特征[J]. 岩土力学, 2015, 36(5): 1407-1414. (SA Peng, WU Fa-quan, LI Xiang, et al.Squeezing deformation in layered surrounding rock and force characteristics of support system of a tunnel under high in-situ stress[J]. Rock and Soil Mechanics, 2015, 36(5): 1407-1414. (in Chinese))
|
[5] |
李树忱, 马腾飞, 蒋宇静. 深部多裂隙岩体开挖变形破坏规律模型试验研究[J]. 岩土力学, 2009, 30(7): 1933-1938. (LI Shu-chen, MA Teng-fei, JIANG Yu-jing, et al.Model tests on deformation and failure laws in excavation of deep rock mass with multiple fracture sets[J]. Chinese Journal of Geotechnical Engineering, 2009, 30(7): 1933-1938. (in Chinese))
|
[6] |
BOSSART P. WERMEILLE S.The stress field in the Mont Terri region-data compilation[C]// Mont Terri Project- Geology, Paleontology, Stress Field. Swiss Geological Survey, Bern. Reports of the Federal Office for Water and Geology (FOWG), Geology Series. Bern, 2003, 4: 65-92.
|
[7] |
BLÜMLING P, BERNIER F, LEBON P, et al. The excavation damaged zonein clay formations time-dependent behaviour and influence on performance assessment[J]. Phys Chem Earth Parts A/B/C, 2007, 32: 588-599.
|
[8] |
MYUNG S G, DUHEE P, JAEHO Y, et al.Experimental and numerical analyses of an opening in a jointed rock mass under biaxial compression[J]. International Journal of Rock Mechanics & Mining Sciences, 2011, 48(7): 1055-1067.
|
[9] |
BONINI M, BARLA G.The saint martin la porte access adit (Lyon-Tutin Base Tunnel) revisited[J]. Tunnelling and Underground Space Technology, 2012, 30: 38-54.
|
[10] |
黄万朋. 深部巷道非对称变形机理与围岩流变及扰动变形控制研究[D]. 北京: 中国矿业大学, 2012. (HUAGN Wan-peng.Analysis on the laws of deep tunnel's asymmetric deformation and control technology of surrounding rock's rheological and disturbed deformation[D]. Beijing: China University of Mining and Technology, 2012. (in Chinese))
|
[11] |
孙晓明, 何满潮, 杨晓杰. 深部软岩巷道锚网索耦合支护非线性设计方法研究[J]. 岩土力学, 2006, 27(7): 1061-1065. (SUN Xiao-ming, HE Man-chao, YANG Xiao-jie.Research on nonlinear mechanical design method of bolt-net-anchor coupling support for deep soft rock tunnel[J]. Rock and Soil Mechanics, 2006, 27(7): 1061-1065. (in Chinese))
|
[12] |
ANAGNOSTOU G, CANTIENI L.Design and analysis of yielding support in squeezing ground[C]// 11th Congress of the International Society for Rock Mechanics. Lisbon, 2007: 829-832.
|
[13] |
RAMONI M, ANAGNOSTOU G.Tunnel boring machines undersqueezing conditions[J]. Tunnelling and Underground Space Technology, 2010b, 25(2): 139-157.
|
[14] |
YU Yang, BAI Jian-biao, WANG Xiang-yu, et al.High-resistance controlled yielding supporting technique in deep-well oil shale roadways[J]. International Journal of Mining Science and Technology, 2014, 24(2): 229-236.
|
[15] |
韩昌瑞, 白世伟, 王玉朋, 等. 层状岩体深埋长隧道锚杆支护优化设计[J]. 岩土力学, 2016, 37(增刊1): 409-414. (HAN Chang-rui, BAI Shi-wei, WANG Yu-peng, et al.Optimum design of rock bolts supporting long-deep tunnel in layered surrounding rock mass[J]. Rock and Soil Mechanics, 2016, 37(S1): 409-414. (in Chinese))
|
[16] |
熊亮. 层状围岩隧道稳定性及锚杆支护参数优化[D]. 重庆: 重庆大学, 2010. (XIONG Liang.Layered rock stability and bolt support parameter optimization of tunnel[D]. Chongqing: Chongqing University, 2010. (in Chinese))
|
[17] |
地盘工学会.シールドトンネルの新技術[M]. 东京: 鹿岛出版社, 1997. (Research Association on New Shield Tunnology. New technology in shield tunneling[M]. Tokyo: Kajima Institute Publishity Co. Ltd. 1998. (in Japanese))
|
[18] |
同济大学. 可模拟盾构隧道管片接头的试验模型及其制作方法: 中国, 200810038954.6[P].2008-10-3. (Tongji University. Trial model capable of simulating shield tunnel pipe slice joint and manufacturing method thereo:China,200810038954.6[P].2008-10-3. (in Chinese))
|
[19] |
王士民, 于清洋, 彭博, 等. 封顶块位置对盾构隧道管片结构力学特征与破坏形态的影响分析[J]. 岩土工程学报, 2016, 49(6): 123-132. (WANG Shi-min, YU Qing-yang, PENG Bo, et al.Analysis of mechanical characteristics and failure pattern of shield tunnel segment with different position of key block[J]. China Civil Engineering Journal, 2016, 49(6): 123-132. (in Chinese))
|