[1] |
蒋 冲, 周科平, 胡毅夫. 深圳平安金融中心基坑围护结构变形监测分析[J]. 岩石力学与工程学报, 2012, 31(增刊1): 3383-3389. (JIANG Chong, ZHOU Ke-ping, HU Yi-fu. Deformation monitoring and analysis of retaining structure infoundation pit of Ping’an financial center in Shenzhen[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(S1): 3483-3489. (in Chinese))
|
[2] |
水伟厚, 李 广, 李国章, 等. 上海浦东国际机场二期登机长廊基坑监测分析[J]. 岩土工程学报, 2007, 28(增刊1): 1819-1822. (SHUI Wei-hou, LI Guang, LI Guo-zhang, et a1. Excavation monitoring of Shanghai Pudong International Air port[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S1): 1819-1822. (in Chinese))
|
[3] |
任永忠, 朱彦鹏, 周 勇. 兰州市某深基坑支护设计及监测研究分析[J]. 岩土工程学报, 2012, 34(增刊1): 705-710. (REN Yong-zhong, ZHU Yan-peng, ZHOU Yong. Design and monitoring of bracings for a deep foundation pit in Lanzhou[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(S1): 705-710. (in Chinese))
|
[4] |
王 源, 刘松玉, 谭跃虎, 等. 南京长江隧道浦口深基坑信息化施工与分析[J]. 岩土工程学报, 2009, 31(11): 1784-1791. (WANG Yuan, LIU Song-yu, TAN Yue-hu, et al. Analysis and information construction of Pukou deep foundation pit of Nanjing Yangtze River tunnel[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(11): 1784-1791. (in Chinese))
|
[5] |
覃卫民, 张照仪, 王 浩, 等. 武汉团结小区商住楼工程基坑施工监测分析[J]. 岩土工程学报, 2006, 28(增刊1): 1830-1833. (QIN Wei-min, ZHANG Zhao-yi, WANG Hao, et al. Analysis of excavation monitoring for Tuanjie building in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S1): 1830-1833. (in Chinese))
|
[6] |
高华东. 北京某深基坑开挖监测实例[J]. 岩土工程学报,2006, 28(增刊1): 1853-1857. (GAO Hua-dong. Monitoring of a deep excavation in Beijing[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S1): 1853-1857. (in Chinese))
|
[7] |
刘国彬, 刘登攀, 刘丽雯, 等. 基坑坑底施工阶段围护墙变形监测分析[J]. 岩石力学与工程学报, 2007, 26(增刊2): 4386-4394. (LIU Guo-bin, LIU Deng-pan, LIU Li-wen, et al. Monitoring and analysis of lateral deformation of retaining wall during bottom excavation in deep pit[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(S2): 4386-4394. (in Chinese))
|
[8] |
孙 凯, 许振刚, 刘庭金,等. 深基坑的施工监测及其数值模拟分析[J]. 岩石力学与工程学报, 2004, 23(2): 293-298. (SUN Kai, XU Zhen-gang, LIU Ting-jin, et a1. Construction monitoring and numerical smiulation foundation of a analysis pit[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(2): 293-298. (in Chinese))
|
[9] |
安关峰, 宋二祥. 广州地铁琶州塔站工程基坑监测分析[J]. 岩土工程学报, 2005, 27(3): 333-337. (AN Guan-feng, SONG Er-xiang. The analysis of excavation monitoring for the Pazhouta subway station in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(3): 333-337. (in Chinese))
|
[10] |
周香莲, 王建华, 黄 鑫. 宁波北仑电厂二期循环水泵房基坑支护与监测[J]. 岩土力学, 2002, 23(1): 120-123. (ZHOU Xiang-lian, WANG Jian-hua, HUANG Xin. Supporting and monitoring deep excavation of the phase II pump-station of circulation water of Beilun in Ningbo[J]. Rock and Soil Mechanics, 2002, 23(1): 120-123. (in Chinese))
|
[11] |
应宏伟, 杨永文. 杭州深厚软黏土中某深大基坑的性状研究[J]. 岩土工程学报, 2011, 33(12): 1838-1846. (YING Hong-wei, YANG Yong-wen. Characteristics of a large and deep soft clay excavation in Hangzhou[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(12): 1838-1846. (in Chinese))
|
[12] |
郑俊杰, 章荣军, 丁烈云, 等. 基坑被动区加固的位移控制效果及参数分析[J]. 岩石力学与工程学报, 2010, 29(5): 1042-1051. (ZHENG Jun-jie, ZHANG Rong-jun, DING Lie-yun, et al. Displacement control effects and parameter analysis of passive zone improvement of foundation pits[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(5): 1042-1051. (in Chinese))
|
[13] |
MANA A I, CLOUGH G W. Prediction of movements for braced cuts in clay[J]. Journal of the Geotechnical Engineering Division, 1981, 107(6): 759-777.
|