覆盖层上混凝土面板堆石坝建坝技术创新与发展

    Technological Innovation and Development of Construction and Engineering Safety for Concrete-Faced Rockfill Dams

    • 摘要: 建国77年以来,中国混凝土面板堆石坝筑坝技术稳步、快速发展,取得卓著成就。我国已建立了200 m级高面板堆石坝设计体系,并逐步形成了250m级关键技术体系,工程建设正向复杂环境条件下的更高坝级发展。本文系统梳理了我国面板堆石坝建坝技术发展历程,总结了堆石料本构模型、多场耦合、多体接触及大规模高性能数值计算等方面的安全评价技术进展,并阐述了面板坝全生命期“查诊治管”工程安全技术体系。在此基础上,面向高面板堆石坝的复杂建坝条件,提出未来建坝与工程安全技术的发展方向。

       

      Abstract: Over the 77 years since the founding of the People’s Republic of China, concrete-faced rockfill dam (CFRD) construction technology has advanced steadily and rapidly, achieving remarkable progress. China has established a design system for 200 m-class high CFRDs and is progressively developing a key technology system for 250 m-class CFRDs, with dam construction moving toward greater heights and increasingly complex environmental conditions. This paper reviews the development of CFRD construction technology in China, summarizes advances in key safety assessment technologies, including constitutive models for rockfill materials, multi-field coupling, multi-body contact analysis, and large-scale high-performance numerical computation, and presents a life-cycle engineering safety framework integrating “inspection, diagnosis, remediation, and management”. Future directions for CFRD construction and engineering safety technologies are proposed to address the challenges associated with high CFRDs and complex construction conditions.

       

    /

    返回文章
    返回