Citation: | REN Ying-nan, WANG Hong-qi, WANG Jian-hua. Settlement control of Qiantang River embankments during undercrossing of EPB shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 936-939. |
[1] |
杨红禹, 周建民. 论我国越江隧道的发展[J]. 地下空间, 2000, 20(3): 209-213. (YANG Hong-yu, ZHOU Jian-min. On the development of under-river tunnel in China[J]. Underground Space, 2000, 20(3): 209-213. (in Chinese))
|
[2] |
毛建东. 某盾构施工钱塘江大堤监测成果分析[J]. 水利建设与管理, 2011, 5: 58-75. (MAO Jian-dong. Monitoring result analysis of Qiantang river levee construction[J]. Water Conservancy Construction and Management, 2011, 5: 58-75. (in Chinese))
|
[3] |
沈建奇. 基于并行计算的盾构机过大堤三维数值模拟[J]. 上海交通大学学报, 2008, 48(8): 1296-1300. (SHEN Jian-qi. Three dimensional numerical simulation of shield tunneling through flood levee based on parallel computing[J]. Journal of Shanghai Jiaotong University, 2008, 48(8): 1296-1300. (in Chinese))
|
[4] |
张忠苗, 林存刚, 吴世明, 等. 过江盾构隧道穿越大堤的地层沉降分析及控制[J]. 岩土工程学报, 2011, 33(6): 977-984. (ZHANG Zhong-miao, LIN Cun-gang, WU Shi-ming, et al. Analysis and control of ground settlement of embankments in construction of cross-river shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(6): 977-984. (in Chinese))
|
[5] |
李宗梁, 黄锡刚. 泥水盾构穿越堤坝沉降控制研究[J]. 现代隧道技术, 2011, 48(1): 103-110. (LI Zong-liang, HUANG Xi-gang. Subsidence control research of slurry shield through the embankment[J]. Modern Tunnelling Technology, 2011, 48(1): 103-110. (in Chinese))
|
[6] |
徐国庆, 岳丰田, 王弘琦, 等. 杭州地铁1号线穿越钱塘江地层沼气释放技术探讨[J]. 隧道建设, 2013(3): 247-251. (XU Guo-qing, YUE Feng-tian, WANG Hong-qi, et al. Technology for methane releasing in shield tunneling through Qiantang river formation: Case study on line 1 of Hangzhou metro[J]. Tunnel Construction, 2013(3): 247-251. (in Chinese))
|