Citation: | ZHANG Long, LIU Yao-ru, YANG Qiang, LI Bo. Global stability of Yangfanggou Arch Dam by 3D nonlinear FEM analysis and geomechanical model tests[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 239-246. |
周维垣,杨若琼,刘耀儒,等. 高拱坝整理稳定地质力学模型试验研究[J]. 水力发电学报, 2005, 24(1): 53-58, 64. (ZHOU Wei-yuan, YANG Ruo-qiong, LIU Yao-ru, et al. Research on geomechanical model of rupture tests of arch dam for their stability[J]. Journal of Hydrauelectric Engineering, 2005,24(1): 53-58, 64. (in Chinese))
ZHOU W Y,YANG R Q. Determination of stability of arch dam abutment using finite method and geomechanical model[C]// Proceedings 4th Australia-New Zealand Conference on Geomechanics. Perth, Western Australia, 1984. YU X,ZHOU Y F,PENG S Z. Stability analysis of dam abutments by 3D elasto-plastic finite-element method: a case study of Houhe gravity-arch dam in China[J]. Int J Rock Mech Mining Sci, 2005, 42(3): 415-430. OLiveria S,FARIA R. Numerical simulation of collapse scenarios in reduced scale tests of arch dams[J]. Eng Struct, 2006, 28(10): 1430-1439. 张 林,费文平,李桂林,等. 高拱坝坝肩坝基整体稳定地质力学模型试验研究[J]. (岩石力学与工程学报), 2005, 24(19): 3465-3469.(ZHANG Lin,FEI Wen-ping,LI Gui-lin,et al. Experimental study of global geomechanical model for stability analysis of high arch dam foundation and abutment[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(19): 3465-3469. (in Chinese)) 周维垣,杨若琼. 混凝土拱坝整体三维有限元非线性分析(TFINE有限元程序系列)[R]. 北京: 清华大学水利水电工程系, 1988.(ZHOU Wei-yuan,YANG Ruo-qiong. 3D nonlinear finite element analysis of concrete arch dam(finite element program: TFINE)[R]. Beijing: Department of Hydraulic and Hydropower Engineering, Tsinghua University, 1988. (in Chinese)) 周维垣,杨若琼,罗光福. 拱坝整体地质力学模型破坏试验研究[J]. (水利学报), 1988(2): 27-36.(ZHOU Wei-yuan,YANG Ruo-qiong,LUO Guang-fu. An integral geomechanical model rupture test of an arch dam[J]. Journal of Hydraulic Engineering, 1988(2): 27-36. (in Chinese)) 杨 强,薛利军,王仁坤,等. 岩体变形加固理论及非平衡态弹塑性力学[J]. (岩石力学与工程学报), 2005, 24(20): 3704-3712.(YANG Qiang,XUE Li-jun,WANG Ren-kun,et al. Reinforcement theory considering deformation mechanism of rock mass and nonequilibrium elastoplastic mechanics[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(20): 3704-3712. (in Chinese)) 杨 强,陈 新,周维垣,等. 三维弹塑性有限元中的不平衡力研究[J]. (岩土工程学报), 2004, 26(3): 323-326.(YANG Qiang,CHEN Xin,ZHOU Wei-yuan,et al. On unbalanced forces in 3D elastoplastic finite element analysis[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(3): 323-326. (in Chinese)) JIN F,HU W,PAN J W,et al. Comparative study procedure for the safety evaluation of high arch dams[J]. Computers and Geotechnics, 2011, 38: 306-317. ZHANG G X,LIU Y,ZHOU Q J. Study on real working performance and overload safety factor of high arch dam[J]. Sci China Ser E: Technol Sci, 2008, 51: 48-59. LIU J,FENG X T,DING X L,et al. Stability assessment of the Three -Gorges Dam foundation, China, using physical and numerical modeling-Part Ⅰ: physical model tests[J]. Int J Rock Mech Mining Sci, 2003, 40(5): 609-631. 周维垣,杨若琼,剡公瑞. 高拱坝稳定性评价的方法和准则[J]. (水电站设计), 1997, 13(2): 1-7.(ZHOU Wei-yuan,YANG Ruo-qiong,YAN Gong-rui. Stability evaluation methods and criteria in designing large arch dams[J]. Design of Hydroelectric Power Station, 1997, 13(2): 1-7. (in Chinese)) 杨 强,刘耀儒,陈英儒,等. 变形加固理论及高拱坝整体稳定与加固分析[J]. (岩石力学与工程学报), 2008, 27(6): 1121-1136.(YANG Qiang,LIU Yao-ru,CHEN Yin-ru,et al. Deformation reinforcement theory and global stability and reinforcement of high arch dam[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(6): 1121-1136. (in Chinese)) 官福海,刘耀儒,杨 强,等. 白鹤滩高拱坝坝趾锚固研究[J]. (岩石力学与工程学报), 2010, 29(7): 1323-1332.(GUAN Fu-hai,LIU Yao-ru,YANG Qiang,et al. Research on anchorage of dam toe of BAI He-tan high arch dam[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(7): 1323-1332. (in Chinese)) FEI W P,ZHANG L,ZHANG R. Experimental study on a geo-mechanical model of a high arch dam[J]. Int J Rock Mech Mining Sci, 2010, 47(2): 299-306. |