Citation: | LIU Yi, LI Jing-pei, CHEN Wei. Key construction techniques for oversized excavation pits using top-down method[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 489-494. |
刘国彬,王卫东. 基坑工程手册[M]. 2版.北京:中国建筑工业出版社, 2009.(LIU Guo-bin,WANG Wei-dong. Excavation engineering manual[M]. 2nd.Beijing:China Architecture & Building Press, 2009. (in Chinese))
叶可明,王允恭,李定江. 上海高层建筑多层地下室逆作法施工技术[J]. (建筑施工), 1998(5): 2-7.(YE Ke-ming,WANG Yun-gong,LI Ding-jiang. Up-side-down construction technology adopted for multistory basement of highrise building in shanghai[J]. Building Construction, 1998(5): 2-7. (in Chinese)) 石震东. 逆作法工程中主要施工节点的处理[J]. (建筑施工), 2006, 28(7): 522-523.(SHI Zhen-dong. Treatment of critical construction nodes for project executed with reserved construction method[J]. Building Construction, 2006, 28(7): 522-523. (in Chinese)) 王美华,季 方. 超大面积深基坑逆作法施工技术的探讨[J]. (地下空间与工程学报), 2005(4): 599-602.(WANG Mei-hua,JI Fang. discussion on the construction techniques of oversized excavation pit constructed by top-down method[J]. Underground Space, 2005(4): 599-602. (in Chinese)) 盛春陵,李仁民,王守超,等. 逆作法中立柱调垂方法探讨[J]. (岩土工程学报), 2012, 34: 595-597.(SHENG Chun-ling,LI Ren-min,WANG Shou-chao,et al. Vertical adjustment method for soldier piles in top-down projects[J]. Chinese Journal of Geotechnical Engineering, 2012, 34: 595-597. (in Chinese)) |