Citation: | ZHANG Zong-liang, FENG Ye-lin, XIANG Biao, YUAN You-ren. Design, researches and practices of impervious materials for core wall of Nuozhadu Hydropower Station[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(7): 1323-1327. |
[1] |
张宗亮. 糯扎渡水电站工程特点及关键技术研究[J]. (水力发电), 2005, 31(5): 4-7.(ZHANG Zong-liang. The project characteristics of Nuozhadu hydropower station and its key technology research results[J]. Water Power, 2005, 31(5): 4-7. (in Chinese))
DL/T 5388—2007 水电水利工程天然建筑材料勘察规程[S]. 5388—2007 水电水利工程天然建筑材料勘察规程[S]. 2007.(DL/T 5388—2007 Code of natural building material investigation for hydropowerwater resources project[S]. 5388—2007 Code of natural building material investigation for hydropower and water resources project[S]. 2007. (in Chinese)) 张宗亮,袁友仁,冯业林. 糯扎渡水电站高心墙堆石坝关键技术研究[J]. (水力发电), 2006, 32(11): 5-8.(ZHANG Zong-liang,YUAN You-ren,FENG Ye-lin. Study on key techniques of Nuozhadu’s earth core rockfill dam[J]. Water Power, 2006, 32(11): 5-8. (in Chinese)) 张宗亮,于玉贞,张丙印. 高土石坝工程安全评价与预警信息管理系统[J]. (中国工程科学), 2011, 13(12): 33-37.(ZHANG Zong-liang,YU Yu-zhen,ZHANG Bing-yin. An information management system of safety assessment and warning for high earth rockfill dam[J]. Engineering Sciences, 2011, 13(12): 33-37. (in Chinese)) 张丙印,袁会娜,孙 逊. 糯扎渡高心墙堆石坝心墙砾石土料变形参数反演分析[J]. (水力发电学报), 2005, 24(3): 18-23.(ZHANG Bing-yin,YUAN Hui-na,SUN Xun. The back-analysis of deformation parameters of core gravelly soil of the Nuozhadu high rock-fill dam[J]. Journal of Hydroelectric Engineering, 2005, 24(3): 18-23. (in Chinese)) 张丙印,袁会娜,李全明. 基于神经网络和演化算法的土石坝位移反演分析[J]. (岩土力学), 2005, 26(4): 547-552.(ZHANG Bing-yin,YUAN Hui-na,LI Quan-ming. Displacement back analysis of embankment dam based on neural network and evolutionary algorithm[J]. Rock and Soil Mechanics, 2005, 26(4): 547-552. (in Chinese)) |