Citation: | HUANG De-zhong, MA Xian-feng, WANG Jun-song, LI Xiao-yun, YU Long. Centrifuge modelling of effects of shield tunnels on existing tunnels in soft clay[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(3): 520-527. |
[1] |
仇文革 . 地下工程近接施工力学原理与对策的研究 [D]. 成都 : 西南交通大学 , 2003. (QIU Wen-ge. The study on mechanics principle and countermeasure of approaching excavation in underground works[D]. Chengdu: Southwest Jiaotong University, 2003. (in Chinese))
|
[2] |
陈卫军 , 朱忠隆 . 近距离交叠隧道研究现状及评析 [J]. 现代隧道技术 , 2002, 39 (1): 42 – 46. (CHEN Wei-jun, ZHU Zhong-long. A review on the technology used in closely overlapped tunnels[J]. Modern Tunnelling Technology, 2002, 39 (1): 42 – 46. (in Chinese))
|
[3] |
KIM S H. Model testing and analysis of interactions between tunnels in clay[D]. Oxford: University of Oxford, 1996.
|
[4] |
周文波 , 吴惠明 . 上海地铁二号线盾构法隧道施工难题浅述 [J]. 上海市政工程 , 2000(3): 68 – 77. (ZHOU Wen-bo, WU Hui-ming. Difficulties during construction of shield tunnel in Shanghai Metro No. 2 Line[J]. Shanghai Municipal Engineering, 2000(3): 68 – 77. (in Chinese))
|
[5] |
俞 涛 . 地铁盾构隧道近接施工影响的数值模拟及模型试验研究 [D]. 成都 : 西南交通大学 , 2005. (YU Tao. Numerical simulation and model test for effects of close-spaced construction of subway shield tunnels[D]. Chengdu: Southwest Jiaotong University, 2005. (in Chinese))
|
[6] |
何 川 , 苏宗贤 , 曾东洋 . 地铁盾构隧道重叠下穿施工对上方已建隧道的影响 [J]. 土木工程学报 , 2008, 41 (3): 91 – 98. (HE Chuan, SU Zong-xian, ZENG Dong-yang. Influence of metro shield tunneling on existing tunnel directly above[J]. China Civil Engineering Journal, 2008, 41 (3): 91 – 98. (in Chinese))
|
[7] |
KIMURA T, KUSAKABE O. Centrifuge model tests 2: introduction[J]. Soils and Foundations, 1987, 35 (11): 68 – 74.
|
[8] |
TAYLOR R N. Geotechnical centrifuge technology[M]. London : Blackie Academic & Professional, 1995: 20 – 33.
|
[9] |
陈 亮 , 黄宏伟 , 王如路 . 近距离上部穿越对原有隧道沉降的影响分析 [J]. 土木工程学报 , 2006, 39 (6): 83 – 87. (CHEN Liang, HUANG Hong-wei, WANG Ru-lu. Analysis of the observed longitudinal settlement of a tunnel caused by an adjacent shield tunneling on top[J]. China Civil Engineering Journal, 2006, 39 (03): 83 – 87. (in Chinese))
|
[10] |
MARSHALL A M. Tunnelling in sand and its effect on pipelines and piles[D]. London: University of Cambridge, 2009.
|
[11] |
志波由纪夫 , 川岛一彦 , 大日方尚己 , 等 . シ — ルドトネルの耐震解析にる长手方向覆工刚性の评价法 [C]// 土木学会论文集 . 1988: 319 – 327. (SHINAMI Yukio, KAWASHIMA, Kazuhiko, et al. Evaluation of lining stiffness of shield tunnel in longitudinal direction in seismic analysis[C]// Proceedings of Japanese Civil Engineering Society. 1988: 319 – 327. (in Japanese))
|
[12] |
叶 飞 , 朱合华 , 丁文其 , 等 . 施工期盾构隧道上浮机理与控制对策分析 [J]. 同济大学学报 ( 自然科学版 ), 2008, 36 (6): 738 – 743. (YE Fei, ZHU He-hua, DING Wen-qi, et al. Analysis and control of upward moving of shield tunnel under construction[J]. Journal of Tongji University (Natural Science), 2008, 36 (6): 738 – 743. (in Chinese))
|