• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
XU Qian-wei, MA Jing, ZHU He-hua, DING Wen-qi, JIN Fang-fang, MING Juan. Pseudo-three-dimensional experimental study on tunnel face stability in weak and fractured rock mass[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 465-470.
Citation: XU Qian-wei, MA Jing, ZHU He-hua, DING Wen-qi, JIN Fang-fang, MING Juan. Pseudo-three-dimensional experimental study on tunnel face stability in weak and fractured rock mass[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 465-470.

Pseudo-three-dimensional experimental study on tunnel face stability in weak and fractured rock mass

More Information
  • Received Date: April 25, 2011
  • Published Date: November 30, 2011
  • Tunnelling in weak and fractured rock mass will inevitably induce excessive stress or deformation of surrounding rock, which results in tunnel face collapse accidents. In order to understand the failure modes and progressive failure characteristics, the weak and fractured rock mass of grade Ⅳ according to Chinese codes is taken as the reference prototype. This rock mass is firstly equivalent for isotropic continual stratum, and then modeled by similar materials. Subsequently, model tests are carried out to simulate tunnel excavation under different loading modes. The test results show that, the tunnel face collapses in dome-style in the slow loading mode, while in the fast loading mode, it collapses in chimney shape and reaches ground surface. In the initial stage after excavation, the lateral displacement at the upside of tunnel face is relatively large; with the increase of overlying loads, the lateral displacement at the downside of tunnel face grows drastically and forms the final failure face from bottom to top. After tunnel excavation, the position of the maximal horizontal stress increment locats at the upside of tunnel face near the line center, but the location of maximal vertical stress increment lies in the top of tunnel face profile.
  • [1]
    邓雄业 , 孔祥金 . 靠椅山隧道大塌方处理 [J]. 公路隧道 , 2001(4): 16 – 20. (DENG Xiog-ye, KONG Xiang-jin. Treatment of Kaoyishan mountain tunnel collapse[J]. Highway Tunnel, 2001(4): 16 – 20. (in Chinese))
    [2]
    邓良胜 , 宋战平 , 李 宁 . 紫坪铺工程 F3 断层大断面隧洞施工中塌方机理的数值仿真分析研究 [J]. 水利水电技术 , 2002, 33 (11): 30 – 32. (DENG Liang-sheng, SONG Zhang-ping, LI Ning. Numerical simulation and analysis on the large section tunnel collapse mechanism at F3 fault in Zipingpu project[J]. Water Resource and Hydropower Engineering, 2002, 33 (11): 30 – 32. (in Chinese))
    [3]
    MASHIMO H, SUZUKI M. Stability conditions of tunnel face in sandy ground[C]// Centrifuge 98: Proceedings of the International Conference Centrifuge 98. KIMURA T, KUSAKABE O, TAKEMURA J, eds. Tokyo, 1998: 721 – 725.
    [4]
    AL HALLAK R. Experimental study of the stability of a tunnel face reinforced by bolts[C]// Geotechnical Aspect of Underground Construction in Soft Ground. Balkema, Rotterdam, 2000: 65 – 68.
    [5]
    KAMATA H, MASHIMO H. Centrifuge model test of tunnel face reinforcement by bolting[J]. Tunnelling and Underground Space Technology, 2003(18): 205 – 212.
    [6]
    SEO K, DOMON T, NISHIMURA K. Behaviour of a tunnel face reinforced by bolts: Influence of an deviated installation[J]. Tunnelling and Underground Space Technology, 2006(21): 444 – 449.

Catalog

    Article views (1312) PDF downloads (658) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return