Citation: | ZHU Guo-sheng, WU De-xu, ZHANG Jia-fa, CUI Hao-dong. Seepage control effects of check valve drainage system in canal slope of Middle Route Project of South-to-North Water Diversion[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 22-26. |
[1] |
SL18 — 2004 渠道防渗工程技术规范 [S]. 北京 : 中国水利水电出版社 , 2004 .( SL18 — 2004 Technique specification for seepage prevention engineering on canal[S]. Beijing: China Water and Power Press, 2004. (in Chinese))
|
[2] |
王流泉 , 董晓燕 , 高秀芳 . 南水北调中线总干渠京石段渠道衬砌抗浮稳定设计方案讨论 [J]. 南水北调与水利科技 , 2006, 8 (4): 5 – 6. (WANG Liu-quan, DONG Xiao-yan, GAO Xiu-fang. Design of lining canal's stability against floatation in main canal of the middle route of South to North Water Transfer (from Beijing to Shijiazhuang) [J]. South-to-North Water Transfers and Water Science & Technology, 2006, 8 (4): 5 – 6. (in Chinese))
|