• Indexed in Scopus
  • Source Journal for Chinese Scientific and Technical Papers and Citations
  • Included in A Guide to the Core Journal of China
  • Indexed in Ei Compendex
WANG Qiguo. Major geological problems concerning hydropower development of Tiger Leaping Gorge of Jinsha River[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(8): 1292-1298.
Citation: WANG Qiguo. Major geological problems concerning hydropower development of Tiger Leaping Gorge of Jinsha River[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(8): 1292-1298.

Major geological problems concerning hydropower development of Tiger Leaping Gorge of Jinsha River

More Information
  • Published Date: August 16, 2009
  • There are significant benefits of hydropower development of Tiger Leaping Gorge, justifying the construction of Jinsha River Reservoir in the middle reaches with leading topographical and geological conditions. The hydropower development involves major engineering geological problems: dam-building in earthquake zone, dam-building under riverbed deep cover, large accumulation body stability near abutment and dam, large-scale stability of surrounding rock caverns as well as the high-slope stability, etc. Studies on those problems are of great significance to hydropower development projects of Tiger Leaping Gorge.
  • Related Articles

    [1]WANG Peng, CHU Wen-jie, CHEN Lei, ZHANG Jia-yao. Main engineering geological problems and treatment measures of large underground cavern rock beams during excavation[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(11): 2165-2172. DOI: 10.11779/CJGE201911024
    [2]ZHANG Xian-wei, KONG Ling-wei, ZANG Meng. Engineering geological characteristics of basalt residual soils in Leizhou Peninsula[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(5): 855-863. DOI: 10.11779/CJGE201405007
    [3]HUANG Gang-hai, JIAO Yu-yong, ZHANG Xiu-li. Visual modeling for 3D spherical particle for geological body model of rock engineering[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(4): 782-787. DOI: 10.11779/CJGE201404026
    [4]XU Neng-xiong. 3D engineering geological modeling method suitable for numerical simulation       [J]. Chinese Journal of Geotechnical Engineering, 2009, 31(11): 1710-1716.
    [5]XU Ling, DAI Fu-chu, KWONG A K L, THAM L G, TU Xin-bin. Analysis of some special engineering-geological problems of loess landslide[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(2): 287-293.
    [6]ZHANG Yongshuang, QU Yongxin, LIU Jingru, GUO Changbao. Engineering geological research on altered rocks in the area of NW Yunnan along Yunnan-Tibet Railway line[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(4): 531-536.
    [7]Huang Ying, Fu Bichang. Research on laterization and specific property of laterite in engineering geology[J]. Chinese Journal of Geotechnical Engineering, 1998, 20(3): 40-44.
    [8]Chui Jianwen, Qiao Sen, Fan Yaoxin. Application of Transient Rayleigh Surface Wave Prospecting Method to Engineering Geology[J]. Chinese Journal of Geotechnical Engineering, 1996, 18(3): 35-40.
    [9]Li Xinping, Xia Yuanyou, Hu Chunlin. The Macro-Damage Behaviour of Rockmass and Its Survey Methods in Engineering Geology[J]. Chinese Journal of Geotechnical Engineering, 1995, 17(4): 61-66.
    [10]Li Xiesheng. Treatment of the Engineering Geologic Problems in the Underground Hydroelectric Power Plant of the Fishermans' Creek Ⅰ[J]. Chinese Journal of Geotechnical Engineering, 1982, 4(2): 107-118.

Catalog

    WANG Qiguo

    1. On this Site
    2. On Google Scholar
    3. On PubMed
    Article views (1220) PDF downloads (375) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return