WANG Xiaoyan, DANG Faning, TIAN Wei, ZHANG Jianyou, XIAO Yaoting. Determination of depth of suspended cut-off walls in cofferdam of a hydraulic power station in Dadu River[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(10): 1564-1568.
Citation: WANG Xiaoyan, DANG Faning, TIAN Wei, ZHANG Jianyou, XIAO Yaoting. Determination of depth of suspended cut-off walls in cofferdam of a hydraulic power station in Dadu River[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(10): 1564-1568.

Determination of depth of suspended cut-off walls in cofferdam of a hydraulic power station in Dadu River

More Information
  • Published Date: October 14, 2008
  • Based on the FEM for steady seepage,and combining with the analyse of parametric sensitivity and the objective function in optimal design,the construction schedule was taken as the objective function and the overflow hydraulic gradient and the construction time as the restrictive conditions,the optimization of depth of suspended anti-seepage wall in the cofferdam of a hydraulic power station in the Dadu River was performed.Variation of some sensitive parameters including the hydraulic gradient and the schedule with depth of suspended anti-seepage wall was analyzed,and the relationship among them was obtained through the normalization of thinking.The anti-seepage depth was obtained through the restraint condition,and the optimized depth was then yielded.The results were not only necessary for the economy and safety of the engineering construction,but also reasonable for the theorietical basis of the evaluation to suspended cut-off walls.
  • Related Articles

    [1]MAO Yan-bing, DAI Guo-liang, GONG Wei-ming. Settlement of pile groups based on static load tests on single pile[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 627-631.
    [2]WENG Xiao-lin, ZHANG Chao, MA Hao-hao, SONG Wen-jia. Control criteria for differential settlement of widened road[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(9): 1705-1711.
    [3]ZHANG Qian-qing, ZHANG Zhong-miao, YE Qiang. Accident treatment of large differential settlement between rigid and flexible piles in the same building[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 373-378.
    [4]WANG Tao, LIU Jin-Li. Beneficial factor of pit resilience recompression in view of reducing differential settlement of main building and podium[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 250-255.
    [5]Model tests on control techniques for differential settlement of road widening[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(1).
    [6]HUANG Yu, BAI Jiong, ZHOU Guoming, HUANG Qing. Model tests on settlement of a single pile in saturated sand under unilateral cyclic loading[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(9): 1440-1444.
    [7]ZHU Bin, REN Yu, CHEN Renpeng, CHEN Yunmin, WANG Zhenyu. Model test on bearing capacity and accumulated settlement of single pile subjected to axial cyclic loading[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(2): 186-193.
    [8]GAO Deng, ZHU Bin, CHEN Yunmin. Mechanism and analytic model of wrinkled geomembranes around circular structures subjected to differential settlement[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(8): 1126-1132.
    [9]ZHENG Gang, LIU Shuangju, PEI Yingjie, DIAO Yu. Piled raft with gap between pile top and raft to adjust differential settlement[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(5): 636-641.
    [10]LIU Donglin, ZHENG Gang, LIU Jinli, LI Jinxiu. Experimental study to reduce differential settlements of raft of composite foundation with rigid piles[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(4): 517-523.