ZHENG Gang, LIU Shuangju, PEI Yingjie, DIAO Yu. Piled raft with gap between pile top and raft to adjust differential settlement[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(5): 636-641.
Citation: ZHENG Gang, LIU Shuangju, PEI Yingjie, DIAO Yu. Piled raft with gap between pile top and raft to adjust differential settlement[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(5): 636-641.

Piled raft with gap between pile top and raft to adjust differential settlement

More Information
  • Published Date: May 14, 2008
  • A new type of piled raft was developed with the gap between pile top and raft.It could be adopted to adjust the raft-pile-soil interaction and to reduce differential settlement of buildings.Model tests on piled raft in sand with and without the gap between pile top and raft were carried out.It was shown that the sand among piles with the gap between pile top and raft was compacted earlier than that of coventional piled raft foundation under the same load.The compaction of sand among piles could increase the load carried by soil and at the same time reduce the penetration of pile tip.This would make piles and soil settle together.Piled raft with the gap between pile top and raft could mobilize the bearing capacity of soil effectively,in the meantime reduce the stress concentration at pile top and enhance the bearing resistance of pile tip.
  • Related Articles

    [1]DI Hong-gui, ZHOU Shun-hua, GONG Quan-mei, WANG Pei-xin, XIAO Jun-hua. Differential settlement of metro tunnels and its zonal control in soft deposits[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(zk2): 74-79. DOI: 10.11779/CJGE2015S2016
    [2]WENG Xiao-lin, ZHANG Chao, MA Hao-hao, SONG Wen-jia. Control criteria for differential settlement of widened road[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(9): 1705-1711.
    [3]ZHANG Qian-qing, ZHANG Zhong-miao, YE Qiang. Accident treatment of large differential settlement between rigid and flexible piles in the same building[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 373-378.
    [4]Model tests on control techniques for differential settlement of road widening[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(1).
    [5]GAO Deng, ZHU Bin, CHEN Yunmin. Mechanism and analytic model of wrinkled geomembranes around circular structures subjected to differential settlement[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(8): 1126-1132.
    [6]JIANG Jie, HUANG Maosong, LIANG Fayun, GU Qianyan. Analysis of interaction mechanism of piled raft foundation by use of simplified nonlinear model[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(1): 112-117.
    [7]LIU Donglin, ZHENG Gang. Reply to the discussion on "Experimental study to reduce differential settlements of raft of composite foundation with rigid piles"[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(10): 1594-1595.
    [8]LIU Tao, LIU Mingzhen. Discussion on "Experimental study to reduce differential settlements of raft of composite foundation with rigid piles"[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(10): 1593-1594.
    [9]LIU Donglin, ZHENG Gang, LIU Jinli, LI Jinxiu. Experimental study to reduce differential settlements of raft of composite foundation with rigid piles[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(4): 517-523.
    [10]Zhang Guo-xia, Zhang Nai-rui, Zhang Feng-lin. Nonlinear Differential Settlement Analysis[J]. Chinese Journal of Geotechnical Engineering, 1981, 3(3): 41-48.

Catalog

    DIAO Yu

    1. On this Site
    2. On Google Scholar
    3. On PubMed
    Article views (1264) PDF downloads (308) Cited by()