WU Chunqiu, XIAO Daping, WU Jun. Experimental study on behavior of different uplift piles for deep-embedded underground structure[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(9): 1392-1397.
Citation:
WU Chunqiu, XIAO Daping, WU Jun. Experimental study on behavior of different uplift piles for deep-embedded underground structure[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(9): 1392-1397.
WU Chunqiu, XIAO Daping, WU Jun. Experimental study on behavior of different uplift piles for deep-embedded underground structure[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(9): 1392-1397.
Citation:
WU Chunqiu, XIAO Daping, WU Jun. Experimental study on behavior of different uplift piles for deep-embedded underground structure[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(9): 1392-1397.
1.Institute of Foundation Engineering China Academy of Building Research Beijing 100013 China 2.Beijing Electric Power Transmission and Transformation Company Beijing 102401 China
Based on the field test results of uplift bored piles for a deep-embedded 500 kV underground transformer substation in a coastal city,the uplift behavior of under-reamed bored piles and bored piles with pileshaft post-grouting was studied.The load transfer characteristics and mechanism of uplift capacity improvement for the two different types of uplift piles were investigated.Generally,for long piles in sandy soils,the uplift piles with pileshaft post-grouting were the first option,and the construction period would be shortened.However,for short piles in clayey soils,the under-reamed uplift piles could be more economic in terms of the equivalent pile size and capacity requirements.