HUANG Hongwei, DU Jun, XIE Xiongyao. Simulation of GPR detecting of grouting materials behind shield tunnel segments[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(2): 243-248.
Citation: HUANG Hongwei, DU Jun, XIE Xiongyao. Simulation of GPR detecting of grouting materials behind shield tunnel segments[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(2): 243-248.

Simulation of GPR detecting of grouting materials behind shield tunnel segments

More Information
  • Published Date: February 14, 2007
  • In recent years,there were some defects in the grouting behind the lining of shield tunnels which might cause some heavy aftermaths.When some were filled in the gap behind shield tunnel segments,the propagation rules of electromagnetic waves were summed up through a lot of simulation examinations of detecting of grouting materials behind shield tunnel segments with GPR(Ground Penetrating Radar).Combining simulation examination results with the two-dimensional model based on the finite difference time domain method(FDTD),the distribution of the grouting materials could be identified accurately.It was shown that the profile of GPR might be affected evidently by three factors: the curing period,different mixture ratios and distribution of gaps and grouting materials.Meanwhile,this simulation examination was important for GPR to interpret grouting effect behind shield tunnel segments.
  • Related Articles

    [1]DIAO Yu, LI Guang-shuai, ZHENG Gang. Influencing factors of deep excavation on bearing capacity and settlement of piles beneath excavation[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 207-211. DOI: 10.11779/CJGE2017S2050
    [2]JIANG Wu-jun, YAN Ding-yuan, WANG Ming-ming, LI Yu, CHENG Hua-wei, JIANG Chong, CHENG Zhao. Load-settlement rules and calculation of foundation piles in karst cave[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 67-70. DOI: 10.11779/CJGE2017S2017
    [3]LI Lin, LI Jing-pei, SUN De-an, ZHANG Ling-xiang. Prediction method for time-dependent load-settlement relationship of a jacked pile[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(12): 2327-2334. DOI: 10.11779/CJGE201712023
    [4]ZHANG Xing-xing, ZHANG Jian-min, WEN Yan-feng. Practical method to predict settlement of subgrade induced by long-term traffic loads[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(11): 2067-2072. DOI: 10.11779/CJGE201511018
    [5]MA Xiao, QIAN Jian-gu, HAN Li-ming, CAO Jie, HUANG Mao-song. Equivalent finite element method for long-term settlement of subgrade induced by traffic load[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 910-913.
    [6]SHENG Zhi-qiang, SHI Yu-cheng, SUN Jun-jie, QIU Ren-dong, LU Yu-xia, LIU Kun, WAN Xiu-hong. Three-dimensional FEM analysis of settlement and deformation of pile-soil system under vertical load using ABAQUS[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 366-371.
    [7]ZHENG Gang, DIAO Yu, NG C W W. Finite element analysis on mechanism of effect of extra-deep excavation on vertical load transfer and settlement of a single pile[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(6): 837-845.
    [8]ZHU Bin, REN Yu, CHEN Renpeng, CHEN Yunmin, WANG Zhenyu. Model test on bearing capacity and accumulated settlement of single pile subjected to axial cyclic loading[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(2): 186-193.
    [9]Chen Longzhu, Liang Guoqian, Zhu Jinying, Ge Wei. Analytical Calculation of Axial Loadig-Settlement Curve of Piles[J]. Chinese Journal of Geotechnical Engineering, 1994, 16(6): 30-38.
    [10]Cao Hanzhi. Axial Loading Transfer of Pile and Numberical Calculation Method of Loading-Settlement Curve[J]. Chinese Journal of Geotechnical Engineering, 1986, 8(6): 37-49.