Citation: | BAO Chenggang, ZHAN Liangtong. Relationship between unsaturated soil behavior and engineering problems[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(2): 129-136. |
[1] | CAI Yuebo, XIANG Yan, SHENG Jinbao, MENG Ying. Deep-water detection, monitoring, early warning and treatment of emergencies of major water conservancy projects: a review[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(3): 441-458. DOI: 10.11779/CJGE20221480 |
[2] | ZHU Wu, ZHANG Qin, ZHU Jian-jun, HUANG Guan-wen, WANG Yan-ping, ZHU Hong-hu, HU Wei, HU Jun. Real-time monitoring and early warning technology for huge landslides[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(7): 1341-1350. DOI: 10.11779/CJGE202207012 |
[3] | YANG Guang-yu, JIANG Fu-xing, QU Xiao-cheng, LI Lin, WEI Quan-de, LI Nai-lu. Comprehensive monitoring and early warning technology for rock burst of tunneling face with thick coal seams[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(10): 1949-1958. DOI: 10.11779/CJGE201910021 |
[4] | ZHAO Jiu-bin, LIU Yuan-xue, LIU Na, HU Ming. Association rules of monitoring and early warning by using landslides FRPFP model—Case study of Jiangjin-Fengjie reach in Three Gorges Reservoir area[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(3): 492-500. DOI: 10.11779/CJGE201903011 |
[5] | XU Yang-qing, CHENG Lin. Analysis processing of monitoring data and forecast and early warning system of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 219-224. DOI: 10.11779/CJGE2014S1038 |
[6] | MA Fuheng, HE Xinwang, WU Guangyao. Risk early-warning index system for earth and rockfill dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1734-1737. |
[7] | Radu Popa, Bogdan Popa, Liana Vuta. Behaviour model for dam displacement derived by an evolutionary algorithm[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1637-1642. |
[8] | WANG Zhaosheng, LIU Hanlong, ZHANG Shichen. Development and application of real-time safety evaluation software system for embankment dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1606-1609. |
[9] | YU Yuzhen, LIN Hung chou, LI Guangxin. Analysis of finite element method for early warning of landslide[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(8): 1264-1267. |
[10] | YAO Leihua. Parameters identification of groundwater flow model with genetic algorithm and Gauss-Newton Method[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(8): 885-890. |