LU Mengmeng, SHEN Jun, ZENG Xiantao. 3-D numerical analysis of reinforcement of pre-stressed cable on pit foundation[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(10): 1198-1202.
Citation: LU Mengmeng, SHEN Jun, ZENG Xiantao. 3-D numerical analysis of reinforcement of pre-stressed cable on pit foundation[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(10): 1198-1202.

3-D numerical analysis of reinforcement of pre-stressed cable on pit foundation

More Information
  • Published Date: October 14, 2005
  • The simulative principle of the cable in the program was introduced.Then combining with the model test,the horizontal and vertical displacement trait of the tilted wall and the vertical wall of the pit foundation were compared and analyzed by use of the method of numerical simulation.The numerical results showed that the pre-stressed cable could reduce the horizontal and vertical displacement of the pit foundation remarkably;the reinforcing effect of the full-length bonding cable on the soft rock-soil mass was especially remarkable;the influence of the magnitude of the initial pre-stressing force upon the reinforcing effect on the pit foundation was comparatively evident in the process of the excavation.
  • Related Articles

    [1]CAI Yuebo, XIANG Yan, SHENG Jinbao, MENG Ying. Deep-water detection, monitoring, early warning and treatment of emergencies of major water conservancy projects: a review[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(3): 441-458. DOI: 10.11779/CJGE20221480
    [2]ZHU Wu, ZHANG Qin, ZHU Jian-jun, HUANG Guan-wen, WANG Yan-ping, ZHU Hong-hu, HU Wei, HU Jun. Real-time monitoring and early warning technology for huge landslides[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(7): 1341-1350. DOI: 10.11779/CJGE202207012
    [3]YANG Guang-yu, JIANG Fu-xing, QU Xiao-cheng, LI Lin, WEI Quan-de, LI Nai-lu. Comprehensive monitoring and early warning technology for rock burst of tunneling face with thick coal seams[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(10): 1949-1958. DOI: 10.11779/CJGE201910021
    [4]ZHAO Jiu-bin, LIU Yuan-xue, LIU Na, HU Ming. Association rules of monitoring and early warning by using landslides FRPFP model—Case study of Jiangjin-Fengjie reach in Three Gorges Reservoir area[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(3): 492-500. DOI: 10.11779/CJGE201903011
    [5]XU Yang-qing, CHENG Lin. Analysis processing of monitoring data and forecast and early warning system of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 219-224. DOI: 10.11779/CJGE2014S1038
    [6]MA Fuheng, HE Xinwang, WU Guangyao. Risk early-warning index system for earth and rockfill dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1734-1737.
    [7]Radu Popa, Bogdan Popa, Liana Vuta. Behaviour model for dam displacement derived by an evolutionary algorithm[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1637-1642.
    [8]WANG Zhaosheng, LIU Hanlong, ZHANG Shichen. Development and application of real-time safety evaluation software system for embankment dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1606-1609.
    [9]YU Yuzhen, LIN Hung chou, LI Guangxin. Analysis of finite element method for early warning of landslide[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(8): 1264-1267.
    [10]YAO Leihua. Parameters identification of groundwater flow model with genetic algorithm and Gauss-Newton Method[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(8): 885-890.

Catalog

    Article views (1236) PDF downloads (448) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return