Citation: | SHAO Peng, ZHANG Yong, HE Yongnian, DUAN Chenhui. Dynamic fatigue damage of intermittence jointed rock masses[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(7): 824-827. |
[1] | LIU Fengzhou, XU Qianwei, ZHONG Jixin, HE Xiang, WANG Jing, LAI Shouxi. Instability determination and construction monitoring analysis of shield excavation face in diorite-bearing strata[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(11): 2327-2335. DOI: 10.11779/CJGE20220995 |
[2] | SUN Yan-peng, LING Yong-yu, LIN Xing-chao, ZHAO Yu-fei, AN Xin-zan, YIN Tao. Experimental study on internal monitoring structure of a new prestressed anchor cable[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(S2): 226-230. DOI: 10.11779/CJGE2020S2040 |
[3] | WANG Wei, XU Kai, WANG Hai-long, LI Lu-lu. Application of real-time monitoring technology to foundation settlement of sloping breakwaters in construction[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(s1): 85-90. DOI: 10.11779/CJGE2017S1017 |
[4] | LIAO Wen-lai, ZHANG Jun-lu, CHEN Xiao-wen, DUAN Feng-hu, LI Xing. Monitoring analysis of structural construction of deep thick sand shaft in Zhanjiang Bay[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 460-464. DOI: 10.11779/CJGE2014S2080 |
[5] | CHEN Zhi-fu, CHEN De-li, YANG Jian-xue. Application of three-dimensional laser scanning technique in deformation monitoring of excavations[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 557-559. |
[6] | MA Zong-yu, ZHANG Dong-ming. Design and construction of pile-sinking preventive measures of static pressure piles[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(sup2): 329-332. |
[7] | WEI Guangqing, SHI Bin, HU Sheng, LI Ke, YIN Jianhua. Several key problems in tunnel construction monitoring with FBG[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 571-576. |
[8] | YANG Youhai, WANG Jianjun, WU Jinguang, LI Changshan. Informationized construction monitoring analysis of deep foundation pit for Qiutao Road station of Hangzhou Metro[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(10): 1550-1554. |
[9] | HU Qunfang, HUANG Hongwei. Analysis and monitoring on shield tunneling under existing adjacent tunnel[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(1): 42-47. |
[10] | AN Guanfeng, SONG Erxiang. The analysis of excavation monitoring for the Pazhouta subway station in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(3): 333-337. |