HUO Jiaping, CHEN Shengshui, SHI Quan, DU Jinxin. Analysis of engineering behavior of a dam with clay core[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(5): 578-581.
Citation: HUO Jiaping, CHEN Shengshui, SHI Quan, DU Jinxin. Analysis of engineering behavior of a dam with clay core[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(5): 578-581.

Analysis of engineering behavior of a dam with clay core

More Information
  • Published Date: September 25, 2003
  • Safety monitoring results of a dam with clay core are presented. As the left abutment of the major dam is very steep, the TStype displacement transducers and GKDtype pore water pressure transducers are installed to monitor the displacement and seepage of the joint part of clay core and the abutment. The results show that although the stability of the slope of the dam satisfies the criterion, significant displacement and seepage occur at the interface between left abutment and clay core.Therefore, in designing the bank slope of the dam, special attention must be paid to prevent the displacement and the crack resulted.Seepage at key parts in the dam should be observed. Moreover, in numerical analysis of the dam by finite element method, two set of material constants should be chosen to signify the saturated and unsaturated situations corresponding to construction period and water storage period. 
  • Related Articles

    [1]CAI Yuebo, XIANG Yan, SHENG Jinbao, MENG Ying. Deep-water detection, monitoring, early warning and treatment of emergencies of major water conservancy projects: a review[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(3): 441-458. DOI: 10.11779/CJGE20221480
    [2]ZHU Wu, ZHANG Qin, ZHU Jian-jun, HUANG Guan-wen, WANG Yan-ping, ZHU Hong-hu, HU Wei, HU Jun. Real-time monitoring and early warning technology for huge landslides[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(7): 1341-1350. DOI: 10.11779/CJGE202207012
    [3]YANG Guang-yu, JIANG Fu-xing, QU Xiao-cheng, LI Lin, WEI Quan-de, LI Nai-lu. Comprehensive monitoring and early warning technology for rock burst of tunneling face with thick coal seams[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(10): 1949-1958. DOI: 10.11779/CJGE201910021
    [4]ZHAO Jiu-bin, LIU Yuan-xue, LIU Na, HU Ming. Association rules of monitoring and early warning by using landslides FRPFP model—Case study of Jiangjin-Fengjie reach in Three Gorges Reservoir area[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(3): 492-500. DOI: 10.11779/CJGE201903011
    [5]XU Yang-qing, CHENG Lin. Analysis processing of monitoring data and forecast and early warning system of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 219-224. DOI: 10.11779/CJGE2014S1038
    [6]MA Fuheng, HE Xinwang, WU Guangyao. Risk early-warning index system for earth and rockfill dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1734-1737.
    [7]Radu Popa, Bogdan Popa, Liana Vuta. Behaviour model for dam displacement derived by an evolutionary algorithm[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1637-1642.
    [8]WANG Zhaosheng, LIU Hanlong, ZHANG Shichen. Development and application of real-time safety evaluation software system for embankment dams[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(11): 1606-1609.
    [9]YU Yuzhen, LIN Hung chou, LI Guangxin. Analysis of finite element method for early warning of landslide[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(8): 1264-1267.
    [10]YAO Leihua. Parameters identification of groundwater flow model with genetic algorithm and Gauss-Newton Method[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(8): 885-890.

Catalog

    Article views (1225) PDF downloads (414) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return