Citation: | Yin Yueping, Kang Hongda, Zhang Ying. Stability analysis and optimal anchoring design on Lianziya dangerous rockmass[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(5): 599-603. |
[1] | SUN Zhen-yu, ZHANG Ding-li, FANG Qian, HOU Yan-juan. Synergistic optimization design method for tunnel support structure system and its application[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(3): 530-539. DOI: 10.11779/CJGE202103016 |
[2] | LIN Feng. Optimization design of retaining system for deep foundation pits under complex environmental conditions[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 39-45. DOI: 10.11779/CJGE2014S1006 |
[3] | JIANG Yan, YANG Guang-hua, QIAO You-liang, ZHONG Zhi-hui, ZHANG Yu-cheng. Optimal design of a large deep excavation[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 335-341. |
[4] | FENG Yuguo, WANG Weiming, LIU Junxi. Robust optimization design of anti-slide piles with prestressed anchor cables[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 515-520. |
[5] | CHEN Changfu, WU Ziru, CAO Jia, ZHAO Minghua. Gas-based optimization design method of cement-soil retaining wall[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(2): 224-229. |
[6] | XIONG Hui, ZOU Yinsheng, JIANG Jianguo. Dynamic optimizing design of pile-groups considering interaction on upper and lower parts[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(5): 590-594. |
[7] | ZOU Guangdian, CHEN Shengshui. A design method of stabilizing piles and its optimized numerical model[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(1): 11-17. |
[8] | MO Haihong, ZHOU Hanxiang, LAI Aiping. The optimal design of soldier pile system in deep excavation[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(2): 144-148. |
[9] | YANG Wanbin, XUE Xicheng. The optimized calculation method for spacing and cross section of underground tunnels[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 61-63. |
[10] | Xue Xicheng, Yang Wanbin. A calculation method for optimizing the shape of section of a tunnel[J]. Chinese Journal of Geotechnical Engineering, 1999, 21(2): 9-12. |