• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
Chen Yunmin, Chen Renpeng, Wu Shiming, A.F.Van Weele. Determining Static Resistance of Pile Toe During Driving with  Acceleration of  Pile Top[J]. Chinese Journal of Geotechnical Engineering, 1997, 19(6): 16-21.
Citation: Chen Yunmin, Chen Renpeng, Wu Shiming, A.F.Van Weele. Determining Static Resistance of Pile Toe During Driving with  Acceleration of  Pile Top[J]. Chinese Journal of Geotechnical Engineering, 1997, 19(6): 16-21.

Determining Static Resistance of Pile Toe During Driving with  Acceleration of  Pile Top

More Information
  • Published Date: November 20, 1997
  • A method based on the stress-wave theory to estimate the static resistance at pile toe during pile driving has been developed.  In this method, the static resistance at pile toe can be calculated directly with the rebound at pile top and impulse duration from the acceleration signal at pile top.  Compared with CPT, CASE method and blowcount test, the result is more reliable and almost independent of soil-damping, ram-drop-height and cushion-stiffness.  The method can be used to estimate the bearing capacity of single pile and to control the depth of pile to be drived.
  • Related Articles

    [1]XUE Li-ying, YANG Wen-sheng, LI Rong-nian. Discussion and analysis of accident reasons of deep foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 468-473.
    [6]Li Tao. Design Method of Dug Well Foundation of Bridge in Loess Area[J]. Chinese Journal of Geotechnical Engineering, 1997, 19(3): 50-57.

Catalog

    Article views (1179) PDF downloads (365) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return