Citation: | LI Yuzhe, BAI Shu, YANG Xiong, YANG Junsheng, FU Jinyang. Field mechanical tests and analyses of partition walls in unequal-span four-arch tunnels[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(10): 2201-2208. DOI: 10.11779/CJGE20220809 |
[1] |
YANG S, DAI R, AI Z, et al. Analytical solutions for the mechanical responses of shallow double-arched tunnel subjected to symmetric loads[J]. Advances in Civil Engineering, 2021: 8867536.
|
[2] |
张志强, 何川. 连拱隧道中隔墙设计与施工力学行为研究[J]. 岩石力学与工程学报, 2006, 25(8): 1632-1638. doi: 10.3321/j.issn:1000-6915.2006.08.017
ZHANG Zhiqiang, HE Chuan. Study on mechanical behaviours of designing and construction for center pillar of double-arched tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(8): 1632-1638. (in Chinese) doi: 10.3321/j.issn:1000-6915.2006.08.017
|
[3] |
LI S C, YUAN C, FENG X D, et al. Mechanical behaviour of a large-span double-arch tunnel[J]. Ksce Journal of Civil Engineering, 2016, 20(7): 1-9.
|
[4] |
曾胜, 覃庆通, 阳军生. 大跨度连拱隧道直中墙受力现场监测分析[J]. 岩土力学, 2008, 29(9): 2537-2541. doi: 10.3969/j.issn.1000-7598.2008.09.041
ZENG Sheng, QIN Qingtong, YANG Junsheng. In-situ monitoring behaviors of middle wall of large-span multi-arch tunnel[J]. Rock and Soil Mechanics, 2008, 29(9): 2537-2541. (in Chinese) doi: 10.3969/j.issn.1000-7598.2008.09.041
|
[5] |
雷金山, 阳军生, 杨峰, 等. 大跨度偏压连拱隧道现场监测与受力分析[J]. 铁道科学与工程学报, 2010, 7(4): 31-36. https://www.cnki.com.cn/Article/CJFDTOTAL-CSTD201004006.htm
LEI Jinshan, YANG Junsheng, YANG Feng, et al. In-situ monitoring and mechanical analysis of large-span unsymmetrical loading multi-arch tunnel[J]. Journal of Railway Science and Engineering, 2010, 7(4): 31-36. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-CSTD201004006.htm
|
[6] |
苟德明, 阳军生. 连拱隧道复合式曲中墙力学特征分析[J]. 中外公路, 2009, 29(4): 153-156. https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200904041.htm
GOU Deming, YANG Junsheng. Analysis on mechanical characteristics of composite curved middle wall of multi-arch tunnel[J]. Journal of China & Foreign Highway, 2009, 29(4): 153-156. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GWGL200904041.htm
|
[7] |
周丁恒, 曹力桥, 王晓形, 等. 浅埋大断面大跨度连拱隧道支护体系现场监测试验研究[J]. 岩土工程学报, 2010, 32(10): 1573-1581. http://www.cgejournal.com/cn/article/id/8357
ZHOU Dingheng, CAO Liqiao, WANG Xiaoxing, et al. In-situ tests on lining system of double-arch tunnel with shallow large section and span[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(10): 1573-1581. (in Chinese) http://www.cgejournal.com/cn/article/id/8357
|
[8] |
丁智, 何佳威, 陈春来, 等. 连拱隧道中隔墙应力实测分析[J]. 现代隧道技术, 2014, 51(5): 129-133, 138. https://cpfd.cnki.com.cn/Article/CPFDTOTAL-OGTY201411001021.htm
DING Zhi, HE Jiawei, CHEN Chunlai, et al. Stress-monitoring analysis of the intermediate rock pillar in a double-arched tunnel[J]. Modern Tunnelling Technology, 2014, 51(5): 129-133, 138. (in Chinese) https://cpfd.cnki.com.cn/Article/CPFDTOTAL-OGTY201411001021.htm
|
[9] |
瞿永, 郭博, 杨果林, 等. 连拱隧道中隔墙主应变监测方案分析研究[J]. 公路, 2019, 64(12): 304-307. https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL201912002.htm
QU Yong, GUO Bo, YANG Guolin, et al. Research on main strain monitoring scheme of middle partition wall in multi arch tunnel[J]. Highway, 2019, 64(12): 304-307. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL201912002.htm
|
[10] |
SHEN Y S, GAO B. Site monitoring and analytical research on mechanical characteristics under construction partial press in double-arch tunnel[J]. Rock and Soil Mechanics, 2006, 27(11): 2061-2065.
|
[11] |
杨果林, 葛云龙, 彭伟, 等. 连拱隧道复合式曲中墙受力现场监测分析[J]. 华中科技大学学报(自然科学版), 2019, 47(1): 55-59. https://www.cnki.com.cn/Article/CJFDTOTAL-HZLG201901011.htm
YANG Guolin, GE Yunlong, PENG Wei, et al. In-situ testing analysis of compound curved middle wall of multi-arch tunnel[J]. Journal of Huazhong University of Science and Technology (Natural Science Edition), 2019, 47(1): 55-59. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HZLG201901011.htm
|
[12] |
柏署, 杨雄, 李雨哲, 等. 不等跨双向10车道四连拱隧道设计及施工方法[J]. 隧道建设(中英文), 2022, 42(3): 478-486. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD202203017.htm
BAI Shu, YANG Xiong, LI Yuzhe, et al. Design and construction method of two-way ten-lane four-arch tunnels with different spans[J]. Tunnel Construction, 2022, 42(3): 478-486. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD202203017.htm
|
[13] |
湖南省交通规划勘察设计院有限公司. 银星路观音岩隧道施工图[R]. 长沙: 湖南省交通规划勘察设计院有限公司, 2019.
Hunan Provincial Communications Planning, Survey and Design Institute Co., Ltd. Yinxing Road Guanyinyan Tunnel Construction Drawing[R]. Changsha: Hunan Transportation Planning, Survey and Design Institute Co., Ltd., 2019. (in Chinese)
|
[14] |
混凝土结构设计规范: GB 50010—2010[S]. 北京: 中国建筑工业出版社, 2011.
Code for Design of Concrete Structures: GB 50010—2010[S]. Beijing: China Architecture & Building Press, 2011. (in Chinese)
|
[15] |
公路隧道设计规范第一册土建工程: JTG 3370.1—2018[S]. 北京: 人民交通出版社, 2019.
Specifications for Design of Highway Tunnels Section 1 Civil Engineering: JTG 3370.1—2018[S]. Beijing: China Communications Press, 2019. (in Chinese)
|