Citation: | LIU Hai-ming, ZHOU Xiao-gui, WANG Zhong-wei, HUANG Di, YANG Huai-hao. Prediction of subgrade settlement using PMIGM(1,1) model based on particle swarm optimization and Markov optimization[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 205-208. DOI: 10.11779/CJGE2019S1052 |
[1] |
DJONKAMLA Y, DORE G, BILODEAU J P.Development of a prediction model of permanent deformation considering the physical properties of subgrade soil[J]. Canadian Journal of Civil Engineering, 2016, 43(11): 958-967.
|
[2] |
POTTS D M.Numerical analysis: a virtual dream or practical reality (42nd Rankine Lecture)[J]. Géotechnique, 2003, 53(6): 535-573.
|
[3] |
柳治国, 陈善雄, 徐海滨. 沉降预测的非等步长灰色时变参数模型[J]. 岩土力学, 2004, 32(12): 1-4.
(LIU Zhi-guo, CHEN Shan-xiong, XU Hai-bin.Unequal step lengths grey time-varying parameters model for settlement prediction[J]. Rock and Soil Mechanics, 2004, 32(12): 1-4. (in Chinese)) |
[4] |
李洪然, 张阿根, 叶为民. 参数累积估计灰色模型及地面沉降预测[J].岩土力学, 2008, 29(12): 3417-3421.
(LI Hong-ran, ZHANG A-gen, YE Wei-min.Accumulating method GM(1,1) model and prediction of land subsidence[J]. Rock and Soil Mechanics, 2008, 29(12): 3417-3421. (in Chinese)) |
[5] |
GUO X, LIU S, WU L, et al.A multi-variable grey model with a self-memory component and its application on engineering prediction[J]. Engineering Applications of Artificial Intelligence, 2015, 42: 82-93.
|
[6] |
韩晋, 杨岳, 陈峰, 等. 基于非等时距加权灰色模型与神经网络的组合预测算法[J]. 应用数学和力学, 2013, 34(4): 408-419.
(HAN Jin, YANG Yue, CHEN Feng, et al.Combination forecasting algorithm based on non-equal interval weighted grey model and neural network[J]. Applied Mathematics and Mechanics, 2013, 34(4): 408-419. (in Chinese)) |