YAO Wen-bo, HE Shao-hui, ZHANG Jia-wen, LIU Xia-bing, GUO Yan-wei, MA Teng. Deformation mechanism and control technology of segment joints during process of shield tunneling prior to shaft excavation in a heat-supplying tunnel project[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(6): 1056-1065. DOI: 10.11779/CJGE201806011
Citation: YAO Wen-bo, HE Shao-hui, ZHANG Jia-wen, LIU Xia-bing, GUO Yan-wei, MA Teng. Deformation mechanism and control technology of segment joints during process of shield tunneling prior to shaft excavation in a heat-supplying tunnel project[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(6): 1056-1065. DOI: 10.11779/CJGE201806011

Deformation mechanism and control technology of segment joints during process of shield tunneling prior to shaft excavation in a heat-supplying tunnel project

More Information
  • Received Date: March 26, 2017
  • Published Date: June 24, 2018
  • The shaft excavation following the shield tunnel is an efficient and economic method in the construction of heating shield tunnel. Based on the first large cross-section heating shield tunnel project, the stress characteristics and deformation mechanism of segment joints at different construction stages are analyzed using the longitudinal equivalent continuous model and the elastic foundation beam theory, and the control measures are proposed. The numerical model for the full face interface element is established, and the control effect of the measures is analyzed and appraised. Finally, the change laws of longitudinal stresses and segment joints at different construction stages are measured through field monitoring. The results indicate that the deformation of segment joints can be divided into two stages in the shaft excavation following the shield tunnel: foundation excavation and segment removal, and the segment removal is the main reason. The negative bending moment formed in the excavation of shaft affects the bottom segments of tunnel, and the disappearing of remnant shield force caused by segment removal enlarges the loss of longitudinal stress and opening of segment joints. According to the monitoring results, the control measures including longitudinal tension segment and retightening the bolt, pouring concrete in the tunnel bottom and secondary grouting behind the lining can effectively control the loss of longitudinal stress, and reduce the deformation of joints. The maximum opening of segment joints is 3.51 mm, meeting the waterproof requirements of tunnels. The numerical model based on the full face interface element can be used to simulate the mechanical behaviors of the segment joint in construction, and the results can be used as reference for evaluation of the control effects.
  • [1]
    周文波. 盾构法隧道施工技术及应用[M]. 北京: 中国建筑工业出版社, 2004: 21-22.
    (ZHOU Wen-bo.Shield tunneling technology[M]. Beijing: China Architecture & Building Press, 2004: 21-22. (in Chinese))
    [2]
    张新金, 刘维宁, 路美丽, 等. 北京地铁盾构法施工问题及解决方案[J]. 土木工程学报, 2008 , 41(10): 93-99.
    (ZHANG Xin-jin, LIU Wei-ning, LU Mei-li, et al.Problem and solutions of shield tunnel for Beijing metro[J]. China Civil Engineering Journal, 2008, 41(10): 93-99. (in Chinese))
    [3]
    乐贵平, 贺少辉, 罗富荣. 北京地铁盾构隧道技术[M]. 北京: 人民交通出版社, 2012.
    (LE Gui-ping, HE Shao-hui, LUO Fu-rong.Beijing subway shield tunneling technology[M]. Beijing: China Communications Press, 2012. (in Chinese))
    [4]
    THOMAS Kasper, CAROLA Edvardsen, GERT Wittneben, et al.Lining design for the district heating tunnel in copenhagen with steel fiber reinforced concrete segments[J]. Tunneling and Underground Space Technology, 2008, 23(5): 574-587.
    [5]
    张新金. 盾构法与浅埋暗挖法结合建造地铁车站关键技术研究[D]. 北京: 北京交通大学, 2010.
    (ZHANG Xin-jin.Study on key technologies of the metro station constructed by shield tunneling method combined with mining method[D]. Beijing: Beijing Jiaotong University, 2010. (in Chinese))
    [6]
    王芳, 汪挺, 贺少辉, 等. PBA法扩挖大直径盾构隧道修建地铁车站时结构关键节点的受力分析[J]. 中国铁道科学, 2013, 34(05): 54-62.
    (WANG Fang, WANG Ting, HE Shao-hui, et al.Mechanical behavior of critical joints in enlarging large diameter shield tunnel by PBA method to build metro station[J]. China Railway Science, 2013, 34(05): 54-62. (in Chinese))
    [7]
    李兆平, 汪挺, 郑昊. 基于大直径盾构隧道扩挖地铁车站关键工况控制措施研究[J]. 岩石力学与工程学报, 2015, 34(9): 1869-1876.
    (LI Zhao-ping, WANG Ting, ZHENG Hao.Controlling measurements for metro station construction on enlarging large diameter shield tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2015, 34(9): 1869-1876. (in Chinese))
    [8]
    周泽林, 陈寿根, 陈亮, 等. 基坑施工对下卧地铁隧道上抬变形影响的简化理论分析[J]. 岩土工程学报, 2015, 37(12): 2224-2235.
    (ZHOU Ze-lin, CHEN Shou-gen, CHEN Liang, et al.Analysis of uplift deflection of subway tunnel due to adjacent pit excavation[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(12): 2224-2235. (in Chinese))
    [9]
    刘印, 张冬梅, 黄宏伟. 盾构隧道局部长期渗水对隧道变形及地表沉降的影响分析[J]. 岩土力学, 2013, 34(1): 290-298, 304.
    (LIU Yin, ZHANG Dong-mei, HUANG Hong-wei.Influence of long-term partial drainage of shield tunnel on tunnel deformation and surface settlement[J]. Rock and Soil Mechanics, 2013, 34(1): 290-298, 304. (in Chinese))
    [10]
    杨春山, 莫海鸿, 陈俊生, 等. 盾构隧道先隧后井施工法对管片张开量的影响研究[J]. 岩石力学与工程学报, 2014, 33(增刊1): 2870-2877.
    (YANG Chun-shan, MO Hai-hong, CHEN Jun-sheng, et al.Study the influence on segment opening of shield tunneling by tunnels followed by well excavation[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(S1): 2870-2877. (in Chinese))
    [11]
    杨春山. 盾构隧道先隧后井施工对隧道变形的影响及对策研究[D]. 广东: 华南理工大学, 2015.
    (YANG Chun-shan.Influence of shield tunnel construction on tunnel deformation and countermeasures[D]. Guangdong: South China University of Technology, 2015. (in Chinese))
    [12]
    黎国雄, 杨春山. 盾构隧道先隧后井施工技术特点分析[J]. 四川理工学院学报(自然科学版), 2014, 27(3): 75-80.
    (LI Guo-xiong, YANG Chun-shan.Characteristics analysis of tunnel first well after construction method for shield tunnel[J]. Journal of Sichuan University of Science & Engineering (Natural Science Edition), 2014, 27(3): 75-80. (in Chinese))
    [13]
    莫海鸿, 杨春山, 陈俊生, 等. 盾构隧道先隧后井施工中工作井支护结构优化[J]. 中南大学学报(自然科学版), 2016, 47(4): 1346-1352.
    (MO Hai-hong, YANG Chun-shan, CHEN Jun-sheng, et al.Supporting optimization of working well in shield construction with tunnel followed by well excavation[J]. Journal of Central South University (Science and Technology), 2016, 47(4): 1346-1352. (in Chinese))
    [14]
    志波由纪夫, 川島一彦, 大日方尚己. 応答変位法によるシ―ルドトソネルの地震时断面力の算定法[C]// 土木学会論文集. 东京, 1989: 385-394.
    (YUKIS Shiba, KAZUHIKO Kawashima, NAOMI Obinata.Calculation of internal force of structure during earthquake using response displacement method[C]// Proceedings of the Civil Academy. Tokyo, 1989: 385-394. (in Japanese))
    [15]
    志波由纪夫,川島一彦. シ―ルドトソネルの耐震解析に用いる長手方向覆土剛性の評價法[C]// 土木学会論文集. 东京, 1988: 319-327.
    (YUKIS Shiba, KAZUHIKO Kawashima.The evaluation of the duct’s longitudinal rigidity in the seismic analysis of shield tunnel[C]// Proceedings of the Civil Academy. Tokyo, 1988: 319-327. (in Japanese))
    [16]
    郑永来, 韩文星, 童琪华, 等. 软土地铁隧道纵向不均匀沉降导致的管片接头环缝开裂研究[J]. 岩石力学与工程学报, 2005, 24(24): 4552-4558.
    (ZHENG Yong-lai, HAN Wen-xing, TONG Qi-hua, et al.Study on longitudinal crack of shield tunnel segment joint due to asymmetric settlement in soft soil[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(24): 4552-4558. (in Chinese))
    [17]
    黄栩, 黄宏伟, 张冬梅. 开挖卸荷引起下卧已建盾构隧道的纵向变形研究[J]. 岩土工程学报, 2012, 34(7): 1241-1249.
    (HUANG Xu, HUANG Hong-wei, ZHANG Dong-mei.Longitudinal deflection of existing shield tunnels due to deep excavation[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(7): 1241-1249. (in Chinese))
    [18]
    李翔宇, 刘国彬, 杨潇, 等. 基于修正纵向等效连续化模型的隧道变形受力研究[J]. 岩土工程学报, 2014, 36(4): 662-670.
    (LI Xiang-yu, LIU Guo-bin, YANG Xiao, et al.Deformation and stress of tunnel structures based on modified longitudinal equivalent continuous model[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(4): 662-670. (in Chinese))
    [19]
    钟小春, 张金荣, 秦建设, 等. 盾构隧道纵向等效弯曲刚度的简化计算模型及影响因素分析[J]. 岩土力学, 2011, 32(1): 132-136.
    (ZHONG Xiao-chun, ZHANG Jin-rong, QIN Jian-she, et al.Simplified calculation model for longitudinal equivalent bending stiffness of shield tunnel and its influence factors’ analysis[J]. Rock and Soil Mechanics, 2011, 32(1): 132-136. (in Chinese))
    [20]
    Itasca Consulting Group Inc. FLAC3D users manuals[M]. Version 2.1 Minneapolis: Minnesota, 2002.
  • Cited by

    Periodical cited type(5)

    1. 来弘鹏,姚毅,高强,康佐. 地铁隧道穿西安地裂缝的研究进展及“先盾后扩”法的应用展望. 现代隧道技术. 2023(01): 23-33+46 .
    2. 尹清锋,何明高,陈星欣,郭力群. 基于流固耦合的盾构地中对接法管片松动研究. 地下空间与工程学报. 2023(03): 935-945+954 .
    3. 许学昭,李兆平,王凯,何华飞. 基于大直径盾构隧道扩挖地铁车站的结构方案及其关键节点受力和变形. 中国铁道科学. 2021(02): 66-76 .
    4. 张子龙,姜谙男,李兴盛. 先盾后井半盖挖基坑施工过程三维数值分析. 广西大学学报(自然科学版). 2020(04): 757-765 .
    5. 丁增志,宋林波,高夕良,成启航. 基坑结构单元与实体单元差异性分析及应用. 四川建材. 2020(06): 80-82 .

    Other cited types(2)

Catalog

    Article views (302) PDF downloads (173) Cited by(7)