Citation: | JIA Zhe-qiang, ZHANG Ru, ZHANG Yan-fei, GAO Ming-zhong, LIU Qian-ying, LI An-qiang, XIE Jing. Integrated prediction for rockburst of underground powerhouse of Houziyan hydropower station[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(z2): 110-116. DOI: 10.11779/CJGE2016S2018 |
[1] |
张镜剑, 傅冰骏. 岩爆及其判据和防治[J]. 岩石力学与工程学报, 2008, 27(10): 2034-2042. (ZHANG Jing-jian, FU Bing-jun. Rockburst and its criteria and control[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(10): 2034-2042. (in Chinese))
|
[2] |
徐林生, 王兰生, 李永林. 岩爆形成机制与判据研究[J]. 岩土力学, 2002, 23(3): 300-303. (XU Lin-sheng, WANG Lan-sheng, LI Yong -lin. Study on mechanism and judgement of rockbursts[J]. Rock and Soil Mechanics, 2002, 23(3): 300-303. (in Chinese))
|
[3] |
张艳飞, 李治国, 张 茹, 等. 猴子岩水电站地下厂房岩爆倾向性研究[J]. 西南交通大学学报, 2013, 48: 42-49. (ZHANG Yan-fei, LI Zhi-guo, ZHANG Ru, et al. Rockburst tendency research in underground powerhouse of Houziyan hydropower station[J]. Journal of Southwest Jiaotong University, 2013, 48: 42-49. (in Chinese))
|
[4] |
郭怀志, 马启超, 薛玺成, 等. 岩体初始地应力场的分析方法[J]. 岩土工程学报, 1983, 5(3): 64-75. (GUO Huai-zhi, MA Qi-chao, XUE Xi-cheng, et al. The analytical method of the initial stress field for rock masses[J]. Chinese Journal of Geotechnical Engineering, 1983, 5(3): 64-75. (in Chinese))
|
[5] |
何江达, 谢红强, 王启智, 等. 官地水电站坝址区初始地应力场反演分析[J]. 岩土工程学报, 2009, 31(2): 166-171. (HE Jiang-da, XIE Hong-qiang, WANG Qi-zhi, et al. Inversion analysis of initial geostress in dam site of Guandi hydropower project[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(2): 166-171. (in Chinese))
|
[6] |
陈卫忠, 吕森鹏, 郭小红, 等. 基于能量原理的卸围压试验与岩爆判据研究[J]. 岩石力学与工程学报, 2009, 28(8): 1530-1540. (CHEN Wei-zhong, LU Sen-peng, GUO Xiao-hong, et al. Reasearch on unloading confining pressure tests and rockbhurst criterion based on energy theory[J]. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(8): 1530-1540. (in Chinese))
|
[7] |
HE Man-chao, SOUSA R E, MIRANDA T, et al. Rockburst laboratory testsdatabase-Application of data mining techniques[J]. Engineering Geology, 2015, 185: 116-130.
|
[8] |
谷明成, 何发亮, 陈成宗. 秦岭隧道岩爆的研究[J]. 岩石力学与工程学报, 2002, 21(9): 1324-1329. (GU Ming-cheng, HE Fa-liang, CHEN Cheng-zong. Study on rockburst in Qingling tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9): 1324-1329. (in Chinese))
|
[9] |
ZHANG Jing-jian, FU Bing-jun, LI Zhong-kui, et al. Criterion and classification for strain mode rockbursts based on five-factor comprehensive method[J]. News Journal of Rock Mechanics and Engineering, 2011, 88(1): 27-37.
|
[10] |
王兰生. 二郎山隧道高地应力与围岩稳定问题[M]. 北京:地质出版社, 2006. (WANG Lan-sheng. High geostress and surrounding rock stability in Erlang-mountain highway tunnel[M]. Beijing: Geological Publishing House, 2006. (in Chinese))
|
[11] |
武选正, 李名川, 伍宇腾. 锦屏水电枢纽辅助洞工程岩爆现象分析及防治措施[J]. 山东大学学报(工学版), 2008, 38(3): 28-33. (WU Xuan-zheng, LI Ming-chuan, WU Yu-teng. Analysis and prevention measures for rock-burst in the auxiliary tunnel of the Jinping hydropower state[J]. Journal of Shandong University (Engineering Science), 2008, 38(3): 28-33. (in Chinese))
|