Determination methods for effective opening size of geotextiles
1. CCCC Fourth Harbor Engingeering Institute Co., Ltd., Guangzhou 510230, China; 2.Guangzhou Hargour Engineering Quality Examination Co., Ltd., Guangzhou 510230, China
More Information
Received Date:
November 29, 2015
Published Date:
March 24, 2016
Abstract
The determination methods for the effective opening size of geotextiles and geotextile-related products are discussed. They include wet sieving method and dry sieving method. Through comparison and analysis of the test data, the dry sieving method, is applicable to woven geotextiles, and the wet sieving method can be used for all the geotextiles in duding non woven geofabrics.
References
[1]
涂 帆, 李鹏娥. 短纤针刺非织造土工布有效孔径测试值的讨论[J]. 福建工程学报, 2003: 21-23. (TU Fan, LI Peng-e. Effective aperture feld test values[J]. Journal of Fujian Engineering, 2003: 21-23. (in Chinese))
[2]
倪冰选, 张 鹏. 非织造土工布孔径分布测试方法的研究. 产业用纺织品, 2011, 29(3): 31-34. (NI Bing-xuan, ZHANG Peng. Nonwoven geotextile pore size distribution test method research[J]. Industrial Textiles, 2011, 29(3): 31-34. (in Chinese))
Related Articles
[1] NIE Ziyun, TAN Xiaobing, ZHU Zhanguo, GUAN Yongping. A new underground excavation method based on large rigidity support system [J]. Chinese Journal of Geotechnical Engineering, 2024, 46(6): 1332-1338. DOI: 10.11779/CJGE20230236
[2] XU Xing-yu, ZHU Hong-hu, ZHANG Wei, ZHANG Cheng-cheng, SHI Bin. Development of fiber optic monitoring-based visualization system for strain fields of slopes [J]. Chinese Journal of Geotechnical Engineering, 2017, 39(s1): 96-100. DOI: 10.11779/CJGE2017S1019
[3] XU Yang-qing, CHENG Lin. Analysis processing of monitoring data and forecast and early warning system of foundation pits [J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 219-224. DOI: 10.11779/CJGE2014S1038
[4] ZHOU Gan-wu, LI Neng-hui, HE Ning. Automatic monitoring system for safety of earth-rockfill dams based on Internet of Things [J]. Chinese Journal of Geotechnical Engineering, 2014, 36(12): 2330-2334. DOI: 10.11779/CJGE201412023
[5] JIANG Peng-ming, MEI Ling, JI Pei-xiang, ZHOU Ai-zhao. Development and application of monitoring and warning system geological disasters of slope in Zhenjiang Martyrs Cemetery [J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 340-345.
[6] DONG Hai-zhou, KOU Ding-wen, PENG Hu-yue. Computational model for dam leakage velocity in concentrated passage based on distributed optic fiber temperature sensing system [J]. Chinese Journal of Geotechnical Engineering, 2013, 35(9): 1717-1721.
[7] JIAO Zhi-bin, LI Yun-hui, LOU Yan, HE Ning. Automatic safety monitoring system and warning modes for artificial islands in coastal areas [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(9): 1712-1715.
[8] CHEN Zhi-fu, CHEN De-li, YANG Jian-xue. Application of three-dimensional laser scanning technique in deformation monitoring of excavations [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 557-559.
[9] CHEN Chang-liu, YE Shuai-hua, ZHU Yan-peng. Application and monitoring analysis of combined supporting system by prestressed anchors and soil nails for a deep excavation in Lanzhou [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 484-489.
[10] Application of information fusion in slope monitoring and prediction system [J]. Chinese Journal of Geotechnical Engineering, 2005, 27(5): 607-610.
Cited by
Periodical cited type(19)
1.
梁贤伟,郭子亮,袁梓文,穆保岗. 基于MRA-BP神经网络的桩基托换桥墩沉降预测模型研究. 特种结构. 2025(01): 82-86+97 .
2.
杜策,张振,张力,周振,叶怀文. 桩基托换对邻近深基坑历史建筑的变形影响控制研究. 施工技术(中英文). 2024(23): 23-28 .
3.
李旭,郑少强,佟庆伟,绳虎. 多种支护模式下基坑监测数据处理与分析. 山西建筑. 2023(05): 80-84 .
4.
徐现启,马炜,邓才兵,孙书淳. 岩质顺层破碎采石场开挖边坡稳定性分析. 云南水力发电. 2023(02): 17-24 .
5.
田书广,高佳豪,周喻,李想,裴博文,刘汝辉,田峰,李坤. 不断流情况下明挖基坑穿河施工变形特性研究. 建筑结构. 2023(S2): 2024-2032 .
6.
孙若翔. 复杂环境下城市建筑深基坑变形与数值模拟分析. 江西建材. 2022(01): 37-40 .
7.
臧一平,卜成,邵苏文,孙晋晶. 地铁盾构隧道下穿桥梁桩基被动托换加固研究. 山西建筑. 2022(06): 139-143 .
8.
高成雷. 城区明挖基坑地下连续墙支撑体系稳定性研究及监测分析. 建筑技术开发. 2022(10): 148-151 .
9.
阮小勇. 桥梁桩基的门架式托换结构及工作特性研究. 科技创新与应用. 2022(31): 82-88 .
10.
陈治雄. 福州火车站南广场深基坑支护和土方开挖施工关键技术. 建筑技术开发. 2022(19): 139-142 .
11.
杨正华,段军朝,郭庆军,鄢玉胜. 异型变宽连续梁桩基托换变形监测分析. 城市轨道交通研究. 2022(12): 106-111 .
12.
李红,王初生. 隧道桩基主动托换加固效果仿真评价方法. 计算机仿真. 2021(04): 188-192 .
13.
朱会强,张明,张波,张建设,郭波锋. 黄河中下游冲洪积地层PRC管桩深基坑支护. 河南科学. 2021(06): 964-970 .
14.
陈祉阳,王文柱. 地铁车站明挖基坑下穿互通立交桥基础的施工关键技术及变形影响分析. 建筑结构. 2021(S1): 1952-1956 .
15.
吴毅彬,郑伟. 某城际铁路车站天桥主动托换施工方案. 厦门理工学院学报. 2021(03): 62-69 .
16.
闫强,廉向东,凌建明. 边坡开挖支护时序有限元分析. 交通运输工程学报. 2020(03): 61-71 .
17.
郭在旭,向俐蓉,刘会娟,孙晓. 藏东南砂层路堑分层开挖下钻孔桩响应研究. 高速铁路技术. 2020(05): 51-56 .
18.
陈伟志,蒋关鲁,刘勇,陈虹羽. 川藏铁路钻孔桩加固斜坡路基的振动台试验研究. 岩石力学与工程学报. 2020(12): 2540-2556 .
19.
付艳军. 车站基坑开挖对邻近立交桥的影响特性研究. 云南水力发电. 2019(06): 117-121 .
Other cited types(5)