Citation: | LI Peng-fei, WANG Fan, NIE Xiong, ZHANG Cheng-ping. Methods for calculating rock pressure of symmetrical multi-arch deep tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9): 1625-1629. DOI: 10.11779/CJGE201609009 |
[1] |
陈秋南. 非对称连拱隧道动态施工力学模拟研究[D]. 重庆:重庆大学, 2005. (CHEN Qiu-nan. Study on observation construction mechanics simulation for non-symmetry arch tunnel in highway[D]. Chongqing: Chongqing University, 2005. (in Chinese))
|
[2] |
周玉宏, 赵燕明, 程崇国. 偏压连拱隧道施工过程的优化研究[J]. 岩石力学与工程学报, 2002, 21(5): 679-683. (ZHOU Yu-hong, ZHAO Yan-ming, CHENG Chong-guo. Optimum analysis on the construction process for joint arch tunnels in partial pressure[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(5): 679-683. (in Chinese))
|
[3] |
郑宗溪, 孙其清. 不对称双连拱偏压铁路隧道修建技术研究[J]. 铁道工程学报, 2012(8): 60-65. (ZHEN Zong-xi, SUN Qi-qing. Research on construction technology for unsymmetrical multi-arch and unsymmetrically loaded railway tunnel[J]. Journal of Railway Engineering Society, 2012(8): 62-65. (in Chinese))
|
[4] |
王 凯, 张成平, 王梦恕. 胶州湾海底隧道不对称双连拱断面施工优化分析[J]. 中国工程科学, 2012, 14(1): 90-97. (WANG Kai, ZHANG Cheng-ping, WANG Meng-shu. Research on construction optimization of asymmetric double-arch section in Jiaozhou Bay Subsea Tunnel[J]. Engineering Sciences, 2012, 14(1): 90-97. (in Chinese))
|
[5] |
邓 建, 朱合华, 丁文其. 不等跨连拱隧道施工全过程的有限元模拟[J]. 岩土力学, 2004, 25(3): 476-478. (DENG Jian, ZHU He-hua, DING Wen-qi. Finite element simulation of whole excavation operation of a unequal-span double-arch tunnel[J]. Rock and Soil Mechanics, 2004, 25(3): 476-478. (in Chinese))
|
[6] |
胡学兵, 肖 博, 吴胜忠. 非对称连拱隧道设计技术研究[J]. 公路交通技术, 2013(3): 91-96. (HU Xue-bing, XIAO Bo, WU Sheng-zhong. Research on design techniques for asymmetrical double- arch tunnels[J]. Technology of Highway and Transport, 2013, 2(3): 91-96. (in Chinese))
|
[7] |
关则廉. 大跨度不对称双联拱隧道的设计与施工[J]. 西部探矿工程, 2005(9): 119-122. (GUAN Ze-lian. Large span asymmetric double arch tunnel design and construction[J]. West-China Exploration Engineering, 2005(9): 119-122. (in Chinese))
|
[8] |
高 峰, 周谊一, 胡学兵. 厦门市东坪山地下立交工程非对称连拱隧道结构计算分析[J]. 公路交通技术, 2013(1): 102-105. (GAO Feng, ZHOU Yi-yi, HU Xue-bing. Structural computational and analysis for asymmetrical double- arch tunnel structures in underground interchange project in Dongpingshan of Xiamen[J]. Technology of Highway and Transport, 2013(1): 102-105. (in Chinese))
|
[9] |
刘 涛, 沈明荣, 袁 勇. 偏压连拱隧道围岩稳定性模型试验与数值分析[J]. 同济大学学报(自然科学版), 2008, 36(4): 460-465. (LIU Tao, SHEN Ming-rong, YUAN Yong. Model test and 3D numerical simulation study on wall rock mass stability of double-arch tunnel subject to partial press[J]. Journal of Tongji University (Natural Science), 2008, 36(4): 460-465. (in Chinese))
|
[10] |
王 军, 夏才初, 朱合华, 等. 不对称连拱隧道现场监测与分析研究[J]. 岩石力学与工程学报, 2004, 23(2): 267-271. (WANG Jun, XIA Cai-chu, ZHU He-hua, et al. Site monitoring and analysis of non-symmetrical multi-arch highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(2): 267-271. (in Chinese))
|
[11] |
王亚琼, 张少兵, 谢永利, 等. 浅埋偏压连拱隧道非对称支护结构受力性状分析[J]. 岩石力学与工程学报, 2010, 29(增刊1): 3265-3272. (WANG Ya-qiong, ZHANG Shao-bing, XIE Yong-li, et al. Mechanical characteristics of unsymmetrical support structure of shallow-buride bias multi-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(S1): 3265-3272. (in Chinese))
|
[12] |
王 凯, 张成平, 王梦恕. 不对称双连拱海底隧道施工引起的地层变形分析[J]. 岩土力学, 2011, 32(9): 2771-2777. (WANG Kai, ZHANG Cheng-ping, WANG Meng-shu. Asymmetric double-arch subsea tunneling-induced ground deformation analysis[J]. Rock and Soil Mechanics, 2011, 32(9): 2771-2777. (in Chinese))
|
[13] |
张科军, 石雪峰, 李海峰. 大跨度不对称双联拱隧道在复杂地质条件下的施工技术[J]. 铁道标准设计, 2007(增刊2): 90-92. (ZHANG Ke-jun, SHI Xue-feng, LI Hai-feng. Large span asymmetric double arch tunnel construction technology under complex geological conditions[J]. Railway Standard Design, 2007(S2): 90-92. (in Chinese))
|
[14] |
马立忠, 姚永勤. 北京地铁十号线不对称双联拱隧道浅埋暗挖施工技术[J]. 铁道标准设计, 2008(12): 171-173. (MA Li-zhong, YAO Yong-qin. The asymmetric double arch tunnel shallow tunnel construction technology of Beijing subway line 10[J]. Railway Standard Design, 2008(12): 171-173. (in Chinese))
|
[15] |
丁文其, 王晓形, 朱合华, 等. 连拱隧道设计荷载的确定方法[J]. 中国公路学报, 2007, 20(5): 78-82. (DING Qi-wen, WANG Xiao-xing, ZHU He-hua, et al. Defining method for designing load of multi 2 arch tunnel[J]. China Journal of Highway and Transport, 2007, 20(5): 78-82. (in Chinese))
|
[16] |
李鸿博, 郭小红. 公路连拱隧道土压力荷载的计算方法研究[J]. 岩土力学, 2009, 30(11): 3430-3434. (LI Hong-bo, GUO Xiao-hong. Research on calculation methods of earth pressure on muti-arch tunnel for highway[J]. Rock and Soil Mechanics, 2009, 30(11): 3430-3434. (in Chinese))
|
[17] |
李鹏飞, 周 烨, 伍 冬. 隧道围岩压力计算方法及其适用范围[J]. 中国铁道科学, 2013, 34(6): 55-60. (LI Peng-fei, ZHOU Ye, WU Dong. Calculation methods of surrounding rock pressure and application scope[J]. China Railway Science, 2013, 34(6): 55-60. (in Chinese))
|