• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
LI Peng-fei, WANG Fan, NIE Xiong, ZHANG Cheng-ping. Methods for calculating rock pressure of symmetrical multi-arch deep tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9): 1625-1629. DOI: 10.11779/CJGE201609009
Citation: LI Peng-fei, WANG Fan, NIE Xiong, ZHANG Cheng-ping. Methods for calculating rock pressure of symmetrical multi-arch deep tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9): 1625-1629. DOI: 10.11779/CJGE201609009

Methods for calculating rock pressure of symmetrical multi-arch deep tunnels

More Information
  • Received Date: April 21, 2015
  • Published Date: September 24, 2016
  • The mechanical characteristics of asymmetrical multi-arch tunnels are as follows: a symmetric geometry and structure form, large excavation span, various construction processes and complex structural stress. Therefore in the design of supporting structures, the load-structure model is usually used, and till now there aren't any mature methods for estimating the load. In this context, the conditions of asymmetric geometry and structure form of two cavities of a tunnel are considered. Based on the assumption of the double collapsed arches of multi-arch tunnels and according to the Protodyakonov's theory, a formula for calculating the rock pressure under deep buried conditions is derived. Under symmetrical conditions, the derived formula becomes the conventional formula for multi-arch tunnels, which has proved the validity of the derived formula. The research methods and conclusions may provide an important reference for the determination of the design load of asymmetrical multi-arch tunnels.
  • [1]
    陈秋南. 非对称连拱隧道动态施工力学模拟研究[D]. 重庆:重庆大学, 2005. (CHEN Qiu-nan. Study on observation construction mechanics simulation for non-symmetry arch tunnel in highway[D]. Chongqing: Chongqing University, 2005. (in Chinese))
    [2]
    周玉宏, 赵燕明, 程崇国. 偏压连拱隧道施工过程的优化研究[J]. 岩石力学与工程学报, 2002, 21(5): 679-683. (ZHOU Yu-hong, ZHAO Yan-ming, CHENG Chong-guo. Optimum analysis on the construction process for joint arch tunnels in partial pressure[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(5): 679-683. (in Chinese))
    [3]
    郑宗溪, 孙其清. 不对称双连拱偏压铁路隧道修建技术研究[J]. 铁道工程学报, 2012(8): 60-65. (ZHEN Zong-xi, SUN Qi-qing. Research on construction technology for unsymmetrical multi-arch and unsymmetrically loaded railway tunnel[J]. Journal of Railway Engineering Society, 2012(8): 62-65. (in Chinese))
    [4]
    王 凯, 张成平, 王梦恕. 胶州湾海底隧道不对称双连拱断面施工优化分析[J]. 中国工程科学, 2012, 14(1): 90-97. (WANG Kai, ZHANG Cheng-ping, WANG Meng-shu. Research on construction optimization of asymmetric double-arch section in Jiaozhou Bay Subsea Tunnel[J]. Engineering Sciences, 2012, 14(1): 90-97. (in Chinese))
    [5]
    邓 建, 朱合华, 丁文其. 不等跨连拱隧道施工全过程的有限元模拟[J]. 岩土力学, 2004, 25(3): 476-478. (DENG Jian, ZHU He-hua, DING Wen-qi. Finite element simulation of whole excavation operation of a unequal-span double-arch tunnel[J]. Rock and Soil Mechanics, 2004, 25(3): 476-478. (in Chinese))
    [6]
    胡学兵, 肖 博, 吴胜忠. 非对称连拱隧道设计技术研究[J]. 公路交通技术, 2013(3): 91-96. (HU Xue-bing, XIAO Bo, WU Sheng-zhong. Research on design techniques for asymmetrical double- arch tunnels[J]. Technology of Highway and Transport, 2013, 2(3): 91-96. (in Chinese))
    [7]
    关则廉. 大跨度不对称双联拱隧道的设计与施工[J]. 西部探矿工程, 2005(9): 119-122. (GUAN Ze-lian. Large span asymmetric double arch tunnel design and construction[J]. West-China Exploration Engineering, 2005(9): 119-122. (in Chinese))
    [8]
    高 峰, 周谊一, 胡学兵. 厦门市东坪山地下立交工程非对称连拱隧道结构计算分析[J]. 公路交通技术, 2013(1): 102-105. (GAO Feng, ZHOU Yi-yi, HU Xue-bing. Structural computational and analysis for asymmetrical double- arch tunnel structures in underground interchange project in Dongpingshan of Xiamen[J]. Technology of Highway and Transport, 2013(1): 102-105. (in Chinese))
    [9]
    刘 涛, 沈明荣, 袁 勇. 偏压连拱隧道围岩稳定性模型试验与数值分析[J]. 同济大学学报(自然科学版), 2008, 36(4): 460-465. (LIU Tao, SHEN Ming-rong, YUAN Yong. Model test and 3D numerical simulation study on wall rock mass stability of double-arch tunnel subject to partial press[J]. Journal of Tongji University (Natural Science), 2008, 36(4): 460-465. (in Chinese))
    [10]
    王 军, 夏才初, 朱合华, 等. 不对称连拱隧道现场监测与分析研究[J]. 岩石力学与工程学报, 2004, 23(2): 267-271. (WANG Jun, XIA Cai-chu, ZHU He-hua, et al. Site monitoring and analysis of non-symmetrical multi-arch highway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(2): 267-271. (in Chinese))
    [11]
    王亚琼, 张少兵, 谢永利, 等. 浅埋偏压连拱隧道非对称支护结构受力性状分析[J]. 岩石力学与工程学报, 2010, 29(增刊1): 3265-3272. (WANG Ya-qiong, ZHANG Shao-bing, XIE Yong-li, et al. Mechanical characteristics of unsymmetrical support structure of shallow-buride bias multi-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(S1): 3265-3272. (in Chinese))
    [12]
    王 凯, 张成平, 王梦恕. 不对称双连拱海底隧道施工引起的地层变形分析[J]. 岩土力学, 2011, 32(9): 2771-2777. (WANG Kai, ZHANG Cheng-ping, WANG Meng-shu. Asymmetric double-arch subsea tunneling-induced ground deformation analysis[J]. Rock and Soil Mechanics, 2011, 32(9): 2771-2777. (in Chinese))
    [13]
    张科军, 石雪峰, 李海峰. 大跨度不对称双联拱隧道在复杂地质条件下的施工技术[J]. 铁道标准设计, 2007(增刊2): 90-92. (ZHANG Ke-jun, SHI Xue-feng, LI Hai-feng. Large span asymmetric double arch tunnel construction technology under complex geological conditions[J]. Railway Standard Design, 2007(S2): 90-92. (in Chinese))
    [14]
    马立忠, 姚永勤. 北京地铁十号线不对称双联拱隧道浅埋暗挖施工技术[J]. 铁道标准设计, 2008(12): 171-173. (MA Li-zhong, YAO Yong-qin. The asymmetric double arch tunnel shallow tunnel construction technology of Beijing subway line 10[J]. Railway Standard Design, 2008(12): 171-173. (in Chinese))
    [15]
    丁文其, 王晓形, 朱合华, 等. 连拱隧道设计荷载的确定方法[J]. 中国公路学报, 2007, 20(5): 78-82. (DING Qi-wen, WANG Xiao-xing, ZHU He-hua, et al. Defining method for designing load of multi 2 arch tunnel[J]. China Journal of Highway and Transport, 2007, 20(5): 78-82. (in Chinese))
    [16]
    李鸿博, 郭小红. 公路连拱隧道土压力荷载的计算方法研究[J]. 岩土力学, 2009, 30(11): 3430-3434. (LI Hong-bo, GUO Xiao-hong. Research on calculation methods of earth pressure on muti-arch tunnel for highway[J]. Rock and Soil Mechanics, 2009, 30(11): 3430-3434. (in Chinese))
    [17]
    李鹏飞, 周 烨, 伍 冬. 隧道围岩压力计算方法及其适用范围[J]. 中国铁道科学, 2013, 34(6): 55-60. (LI Peng-fei, ZHOU Ye, WU Dong. Calculation methods of surrounding rock pressure and application scope[J]. China Railway Science, 2013, 34(6): 55-60. (in Chinese))

Catalog

    Article views (410) PDF downloads (484) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return