Citation: | LIU Xin-rong, LIU Yong-quan, KANG Jing-wen, YANG Zhong-ping. Prestress loss laws of anchor cables in foundation pits and control measures of tension by steps[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(10): 1794-1801. DOI: 10.11779/CJGE201510007 |
[1] |
程良奎. 岩土锚固的现状与发展[J]. 土木工程学报, 2001, 34(3): 7-12. (CHENG Liang-kui. Present status and development of ground anchorages[J]. China Civil Engineering Journal, 2001, 34(3): 7-12. (in Chinese))
|
[2] |
蒋楚生, 周德培, 周应华. 预应力地梁锚索改善边坡受力状态的理论分析[J]. 岩土工程学报, 2005, 27(8): 974-976. (JIANG Chu-sheng, ZHOU De-pei, ZHOU Ying-hua. Theoretical analysis for stress state improvement in a slope with the prestressed cable-anchor beam[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(8): 974-976. (in Chinese))
|
[3] |
卢萌盟, 沈 俊, 曾宪桃. 预应力锚索加固基坑的三维数值分析[J]. 岩土工程学报, 2005, 27(10): 1198-1202. (LU Meng-meng, SHEN Jun, ZENG Xian-tao. 3-D numerical analysis of reinforcement of pre-stressed cable on pit foundation[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(10): 1198-1202. (in Chinese))
|
[4] |
康红普, 吴拥政, 褚晓威, 等. 小孔径锚索预应力损失影响因素的试验研究[J]. 煤炭学报, 2011, 36(8): 1245-1251. (KANG Hong-pu, WU Yong-zheng, CHU Xiao-wei, et al. Tests on affecting factors for pretension loss of cables with small borehole[J]. Journal of China Coal Society, 2011, 36(8): 1245-1251. (in Chinese))
|
[5] |
陈沅江, 尹 进, 胡毅夫. 软岩边坡锚索预应力定量损失规律研究[J]. 岩石力学与工程学报, 2013, 32(8): 1685-1691. (CHEN Yuan-jiang,YIN Jin,HU Yi-fu. Research on prestress quantitative loss law of soft rock slope anchor cable[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(8): 1685-1691. (in Chinese))
|
[6] |
刘涌江, 杨 静. 预应力锚索加固花岗岩类土质高边坡的现场测试研究[J]. 岩石力学与工程学报, 2011, 30(增刊1): 2924-2929. (LIU Yong-jiang, YANG Jing. Field test study of granite soil high slope reinforced by prestressed cables[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(S1): 2924-2929. (in Chinese))
|
[7] |
于远祥, 谷拴成, 吴 璋, 等. 黄土地层下预应力锚索荷载传递规律的试验研究[J]. 岩石力学与工程学报, 2010, 29(12): 2573-2580. (YU Yuan-xiang, GU Shuan-cheng, WU Zhang, et al. Experimental study of load transfer law of prestressed cables under loess stratum[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(12): 2573-2580. (in Chinese))
|
[8] |
张明聚, 谢小春, 吴 立. 锚索与钢支撑混合支撑体系内力监测分析[J]. 岩土工程学报, 2010, 32(增刊1): 483-488. (ZHANG Ming-ju, XIE Xiao-chun, WU Li. Monitoring analysis of internal force for mixed-support structure of anchor rope and steel support[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 483-488. (in Chinese))
|
[9] |
唐孟雄. 基坑工程预应力锚索锚固力试验研究[J]. 岩石力学与工程学报, 2007, 26(6): 1158-1163. (TANG Meng-xiong. Test study on anchorage force of pre-stressed anchor cables for foundation pit[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(6): 1158-1163. (in Chinese))
|
[10] |
熊智彪, 王启云, 陈振富, 等. 深基坑桩锚支护结构土层预应力锚索工作性能测试分析[J] 安全与环境学报, 2008, 84(3): 101-104. (XIONG Zhi-biao, WANG Qi-yun, CHEN Zhen-fu, et al. On the working performance testing and analysis with the pre-stressed anchor rope in the soil in deep foundation pit[J]. Journal of Safety and Environment, 2008, 84(3): 101-104. (in Chinese))
|
[11] |
朱训国, 杨 庆. 深基坑预应力锚索支护监测数据分析与研究[J]. 西安理工大学学报, 2011, 27(3): 350-354. (ZHU Xun-guo, YANG Qing. The study and analysis of monitoring data for prestressed anchorage in foundation excavation reinforcement engineering[J]. Journal of Xi'an University of Technology, 2011, 27(3): 350-354. (in Chinese))
|
[12] |
JGJ120—2012建筑基坑支护技术规程[S]. 北京:中国建筑工业出版社, 2012. (JGJ120—2012 Technical specification for retaining and protection of building foundation excavations[S]. Beijing: China Architecture and Building Press, 2012. (in Chinese))
|
[13] |
王小勇. 黏土层中拉力型预应力锚杆(索)荷载传递试验研究[D]. 昆明: 昆明理工大学, 2012. (WANG Xiao-yong. Experimental study of load transfer about tension-type prestressed anchor in clay layer[D]. Kunming: Kunming University of Science and Technology, 2012. (in Chinese))
|
[14] |
王渭明, 曹正龙, 王刚刚, 等. 厚冲积层锚索预应力损失研究[J]. 岩土工程学报,2014, 36(9): 1607-1613. (WANG Wei-ming, CAO Zheng-long, WANG Gang-gang, et al. Prestress loss of anchor cables in thick alluvial clay[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(9): 1607-1613. (in Chinese))
|