Citation: | CAI Zheng-yin, HOU Wei, GUAN Yun-fei. Mechanism of sheet-pile wharf with barrier piles[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(10): 1745-1750. DOI: 10.11779/CJGE201510001 |
[1] |
刘永绣, 吴荔丹, 徐光明, 等. 遮帘式板桩码头工作机制[J]. 水利水运工程学报, 2006(2): 8-12. (LIU Yong-xiu, WU Li-dan, XU Guang-ming, et al. Working mechanism of sheet pile wharf with barrier piles[J]. Hydro-Science and Engineering, 2006(2): 8-12. (in Chinese))
|
[2] |
蔡正银, 徐光明, 曾有金, 等. 遮帘式板桩码头土压力离心模型试验研究[J]. 港工技术, 2007, 26(6): 51-55. (CAI Zheng-yin, XU Guang-ming, ZENG You-jin, et al. Experimental study of centrifugal models to test earth pressure on covered sheet pile wharfs[J]. Port Engineering Technology, 2007, 26(6): 51-55. (in Chinese))
|
[3] |
李景林, 蔡正银, 徐光明, 等. 遮帘式板桩码头结构离心模型试验[J]. 岩石力学与工程学报, 2007, 26(6): 1182-1187. (LI Jing-lin, CAI Zheng-yin, XU Guang-ming, et al. Centrifuge modelling test on covered sheet- piled structure of wharf[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(6): 1182-1187. (in Chinese))
|
[4] |
焦志斌, 蔡正银, 王剑平, 等. 遮帘式板桩码头原型观测技术研究[J]. 港工技术, 2005(增刊): 56-59. (JIAO Zhi-bin, CAI Zheng-yin, WANG jian-ping, et al. Study on prototype observation technique of semi-covered type of sheet pile[J]. Port Engineering Technology, 2005(S0): 56-59. (in Chinese))
|
[5] |
李元音, 刘永绣. 遮帘式板桩码头结构的空间有限元法分析[J]. 港工技术, 2005(增刊): 37-40.( LI Yuan-yin,LIU Yong-xiu. Spatial finite element method to analyze covered type structure of sheet piles wharf structure[J]. Port Engineering Technology, 2005(S0): 37-40. (in Chinese))
|
[6] |
彭益达, 赵利平. 港池开挖对遮帘式板桩码头结构的影响[J]. 中国水运, 2014, 14(4): 303-305. (PENG Yi-da, ZHAO Li-ping. The impaction of harbor excavation on the covered sheet-piled wharf[J]. China Water Transport, 2014, 14(4): 303-305. (in Chinese))
|
[7] |
刘文平, 郑颖人, 蔡正银, 等. 遮帘式板桩码头结构有限元分析[J]. 岩土工程学报, 2010, 32(4): 573-577. (LIU Wen-ping, ZHENG Ying-ren, CAI Zheng-yin, et al. Finite element method for covered sheet pile wharfs[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(4): 573-577. (in Chinese))
|
[8] |
黄 伟, 潘 泓, 王燕燕. 全遮帘式板桩码头结构遮帘桩合理桩间距确定[J]. 地下空间与工程学报, 2012, 8(1): 129-134. (HUANG Wei, PAN Hong, WANG Yan-yan. Determination on rational spacing of barrier pile for all-covered type of sheet pile wharf[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(1): 129-134. (in Chinese))
|
[9] |
王元战, 龚晓龙, 李 斌. 遮帘式板桩码头的遮帘效果及其影响因素分析[J]. 水道港口, 2014, 35(1): 81-86. (WANG Yuan-zhan, GONG Xiao-long, LI Bin. Analysis on sheltering effect of covered sheet pile wharf and its influencing factors[J]. Journal of Waterway and Harbor, 2014, 35(1): 81-86. (in Chinese))
|
[10] |
司海宝, 蔡正银, 余 缙. 遮帘式板桩码头结构与土共同作用3D数值分析[J]. 土木工程学报, 2012(5): 182-190. (SI Hai-bao, CAI Zheng-yin, YU Jin. 3D numerical modeling of pile-soil interaction for covered sheet-piled wharf[J]. China Civil Engineering Journal, 2012(5): 182-190. (in Chinese))
|