Citation: | LOU Pei-jie, XU Ying. Discussion on “ Method for calculating loosening earth pressure during construction of shield tunnels”[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1353-1354. DOI: 10.11779/CJGE201507025 |
[1] |
黎春林. 盾构隧道施工松动土压力计算方法研究[J]. 岩土工程学报, 2014, 36(9): 1714-1720. (LI Chun-lin. Method for calculating loosening earth pressure during construction of shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(9): 1714-1720. (in Chinese))
|
[2] |
LI L, AUBERTIN M, BELEM T. Development of a 3D analytical solution to evaluate stresses in backfilled vertical openings[R]. Montréal: École Polytechnique de Montréal, 2005.
|
[3] |
LI L, DUBÉ J S, AUBERTIN M. An extension of Marston’s solution for the stresses in backfilled trenches with inclined walls[J]. Geotechnical and Geological Engineering, 2013, 31(4): 1027-1039.
|