Control of a foundation pit
More Information
Received Date:
July 27, 2014
Published Date:
July 27, 2014
Abstract
The success or failure of a foundation pit is not a pure technical issue. The design, construction and local experience, cost control and so on will determine the economy and safety of the foundation pit. In view of large local difference of foundation pits and difficulty of construction control, Wanda Commercial Properties proposes a series of control methods to realize the whole process of the design and construction management control of the foundation pit from the aspects of exploration, design, construction and supervision and from all levels of group, project company, supervision company and construction company as well as from all dimensions of land acquisition, design analysis, construction control and long-term observation.
References
[1]
大连万达商业地产股份有限公司. 项目地下四大块管理办法[R]. 大连: 大连万达商业地产股份有限公司. (Dalian Wanda Commercial Properties CO, LTD. Measures for the management of four underground project[R]. Dalian: Dalian Wanda Commercial Properties CO, LTD, (in Chinese))
[2]
大连万达商业地产股份有限公司. 商业地产投资建设[R]. 大连: 大连万达商业地产股份有限公司, 2013. (Dalian Wanda Commercial Properties CO, LTD. Investment and development of commercial real estate[R]. Dalian: Dalian Wanda Commercial Properties CO., LTD, 2013. (in Chinese))
Related Articles
[1] WANG Yu, ZHENG Tong, SUN Rui, QI Wenhao, LI Linggui, CHENG Yang, ZHANG Yiming. Comparative tests on seismic performance of anti-slide piles with prestressed anchor cables with different angles [J]. Chinese Journal of Geotechnical Engineering, 2023, 45(S2): 110-115. DOI: 10.11779/CJGE2023S20012
[2] GUO Nan, LU Fa, YANG Xiao-hui, MA Tian-zhong. Bearing characteristics and method of prefabricated for support structure frame-prestressed anchor cable [J]. Chinese Journal of Geotechnical Engineering, 2022, 44(S1): 254-258. DOI: 10.11779/CJGE2022S1045
[3] SUN Yan-peng, LING Yong-yu, LIN Xing-chao, ZHAO Yu-fei, AN Xin-zan, YIN Tao. Experimental study on internal monitoring structure of a new prestressed anchor cable [J]. Chinese Journal of Geotechnical Engineering, 2020, 42(S2): 226-230. DOI: 10.11779/CJGE2020S2040
[4] FAN Gang, ZHANG Jian-jing, FU Xiao, WU Jin-biao, TIAN Hua. Axial force of anchor cables in slope reinforced by double-row anti-slide piles and pre-stressed anchor cables [J]. Chinese Journal of Geotechnical Engineering, 2016, 38(6): 1095-1103. DOI: 10.11779/CJGE201606017
[5] WANG Hong-yun, YAO Xiao-bo, ZHANG Yao, HU Jin. Monitoring and analysis of excavation based on supporting structures of double-row piles and prestressed anchor cables [J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 446-450. DOI: 10.11779/CJGE2014S2077
[6] ZHAO Qi-jia, LIU Zheng-gen. Application of recycling anchor cables in support of excavations [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 480-483.
[7] YANG Zhi-hong, GUO Zhong-xian. Monitoring analysis of pre-stressed load of anchor cables for deep excavations [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 145-148.
[8] HAN Kan, LI Deng-ke, WU Guan-zhong. Pull-out tests on anchoring force of prestressed anchor cables [J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 385-387.
[9] FENG Yuguo, WANG Weiming, LIU Junxi. Robust optimization design of anti-slide piles with prestressed anchor cables [J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 515-520.
[10] GAO Mingshi, ZHANG Nong, GUO Chunsheng, DOU Linming. Mechanics and practice of combined supporting technology of 3D anchor-cable and unloading technology of wall of roadway [J]. Chinese Journal of Geotechnical Engineering, 2005, 27(5): 587-590.