Citation: | TANG Chuan-zheng, TANG Dong-yun, LI Yu-hong. Deformation analysis of foundation pit of a subject station of Metro Line 6 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 198-201. DOI: 10.11779/CJGE2014S1034 |
[1] |
唐传政, 彭晓秋, 熊秋梅, 等. 武汉地铁3号线一期工程车站基坑施工风险控制分析[J]. 岩土工程学报, 2012(增刊): 735-738. (TANG Chuan-zheng, PENG Xiao-qiu, XIONG Qiu-mei, et al. Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2012(S0): 735-738. (in Chinese))
|
[2] |
唐传政. 基坑工程设计质量控制探讨[J]. 城市勘测, 2007(3): 115-118. (TANG Chuan-zheng. Discussion of quality controlling of foundation excavation design[J]. Urban Geotechnical Investigation & Surveying, 2007(3): 115-118. (in Chinese))
|
[3] |
唐传政, 张凯萍. 武汉轨道交通二号线一期地下工程的环境岩土工程问题[J]. 岩土工程界, 2008, 11(2): 30-33. (TANG Chuan-zheng, ZHANG Kai-ping. Environmental and geotechnical problem about Wuhan rail transit underground engineering of No.2 subway line[J]. Geotechnical Engineering World, 2008, 11(2): 30-33. (in Chinese))
|
[4] |
唐传政, 熊秋梅. 浅议武汉地区地下空间建设中的施工技术问题[C]// 中国城市地下空间开发高峰论坛论文集. 武汉: 武汉理工大学出版社, 2011. (TANG Chuan-zheng, XIONG Qiu-mei. Discussion on construction of technical problems in construction of underground space in Wuhan region[C]// Proceedings of the Summit Forum on Urban Underground Space Development in China. Wuhan: Wuhan University of Technology Press, 2011. (in Chinese))
|